Currently reading:
Drayton wiser to electromax boiler

Discuss Drayton wiser to electromax boiler in the Central Heating Systems area at ElectriciansForums.net

Reaction score
0
Hi.
We are looking at installing a Wiser smart heating system inc. trvs
We are currently electric only, with normal rads and a Heatrae sadia electromax combi boiler doing hot water and central heating duties.
Control is via a danfoss tp5000 battery programmable thermostat. This is only a two wire unit. No industry standard back plate so I know I need to wire a backplate for the wiser.
Looking at the wiring diagrams for the boiler and wiser system I believe I need to run a live and neutral from the boiler to the wiser. Is this 240… seems excessive if so, but where best to pick it up, 24 hour on (on boiler) perhaps. Then feeds to HW on and CH on on the wiser backplate. Are these simply reusing the room stat L and room stat R feeds that are currently used for the switching by the tp5000?
Thanks for any thoughts in advance!
 

Attachments

  • 9650B687-8473-469C-913E-C110809D9919.jpeg
    390.1 KB · Views: 6
  • 991B50EF-82F7-42ED-A63A-0265CC493B75.jpeg
    356.5 KB · Views: 6
  • C42714B7-6560-46F1-BA6F-B1C54E2CC98E.jpeg
    480.3 KB · Views: 5
  • 97C0BD2E-BA4D-4597-B0AB-1CF8580CB234.png
    251.8 KB · Views: 6
It looks like you need the single channel version of the wiser control, this will need a permanent mains supply and its switched output connected to the heating L and R of the boiler.
 
Ah interesting. Assuming then that the hot water heats as required solely on the off peak feed unless the boost button is pressed then on 24 hour. Think I was confused by the diagram for the room stat L and R as one appears to go to the CH switch one to the HW switch
 
So second look without being an idiot… on the single zone wiser backplate terminal N and L to boiler N and L (pick up from main boiler supply or 24 Hour N and L?) terminal 1 to Room stat L on boiler and Terminal 3 to Room stat R on boiler? Then hopefully job jobbed?
Thanks
 
So second look without being an idiot… on the single zone wiser backplate terminal N and L to boiler N and L (pick up from main boiler supply or 24 Hour N and L?) terminal 1 to Room stat L on boiler and Terminal 3 to Room stat R on boiler? Then hopefully job jobbed?
Thanks
Yes that is the way to do it
 
Perfect thanks for reminding me I wasn’t paying attention!
Any preference on where to pick up the N and L? The 24 Hour terminals on the boiler are easier from a wiring perspective than the main boiler L and N being in the same block as the room stat terminals
 

Reply to Drayton wiser to electromax boiler in the Central Heating Systems area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock