View Single Post
Old 06-03-2008   #1 (permalink)
G1ZmO
Junior Member
 
Join Date: Mar 2008
Posts: 6
View G1ZmO's Photo Album
Default UPS decommissioning - Best Power S4000

Hi,

I have been asked by my boss to look into whats involved with decommissioning a large UPS system for a customer.

I have an HND Electronics but no high voltage experience.

Can anyone guide me as to what to do? Even if it's to say "No, get someone who's qualified"

The UPS to be deinstalled is a
Best Power S4000 80KVA UPS with 2 full battery cabinets

Thanks

Paul


G1ZmO is offline   Reply With Quote