thanks malcg so my next step would be to do my 2382 17th by the 1st july then apply to niceic or other governing body ive done minor works ie:extra sockets or lighting points.So i believe to register with nic they state that you have to show them 2 pieces of work you have done 1 minor and 1 major but to do these i have to notify building control before doing them and after completion so they can inspect first is this correct if so i believe a major job is a consumer unit and minor could be a socket.Just for info what happens if i dont do 17th before 1st july sorry mate about long post trying to get all info right