Quote:
Originally Posted by mikey12 thanks malcg so my next step would be to do my 2382 17th by the 1st july then apply to niceic or other governing body ive done minor works ie:extra sockets or lighting points.So i believe to register with nic they state that you have to show them 2 pieces of work you have done 1 minor and 1 major but to do these i have to notify building control before doing them and after completion so they can inspect first is this correct if so i believe a major job is a consumer unit and minor could be a socket.Just for info what happens if i dont do 17th before 1st july sorry mate about long post trying to get all info right  |
its not about getting it before 01 Jul, but you WILL have to get it before you join one of the schemes
yes, you quals will be enough to join, but like has already been said, you generally have to be trading for 6 months
the 2392 is a good move if you are not familiar with testing.
If you have done the DEI, you will find 2392 is the about the same level, at least you will have a formal test & inspect qual
You dont NEED 2391 to join a scheme, but you wont be able to do PIR's under the scheme without it