Thread: Part P or 2391
View Single Post
Old 21-04-2008   #21 (permalink)
Shakey
Guest
 
Posts: n/a
View Shakey's Photo Album
Default Re: Part P or 2391

5cm is regardless of wall construction

if the ring was already on an RCD then the spur would be covered

If not as long as YOUR spur was on an rcd you would be allright, or surface mount the cable and label the socket as you have said
  Reply With Quote