View Single Post
Old 24-06-2008   #1 (permalink)
gbrock69
Junior Member
 
Join Date: Jun 2008
Posts: 1
View gbrock69's Photo Album
Default main bonding conductors

i have recently finished a periodic test of a fairly large castle and found that the building had no main equipotential bonding conductors. There is around 22 individual consumer units situated around the building all coming via sub main supplies from the main incoming area. Must the main bonding conductors come from the point of incoming supply or can they come from any of the individual consumer units?

gbrock69 is offline   Reply With Quote