View Single Post
Old 24-06-2008   #2 (permalink)
BillR3
Junior Member
 
Join Date: Jun 2008
Posts: 14
View BillR3's Photo Album
Default Re: main bonding conductors

As long as you have an in spec Zdb at your local consumer units there should be relevant equipotential bonds run from these DB's to associated services/metalwork etc as there should be from the local DB to the point of origin.

Hope this helps

BillR3
BillR3 is offline   Reply With Quote