View Single Post
Old 27-06-2008   #4 (permalink)
EasyFox
Respected Member
 
Join Date: Sep 2007
Posts: 443
View EasyFox's Photo Album
Default Re: testing for a minor major work

So you are extending a circuit in a special location, it's notifiable then.
Do a MWC so thats
continuity (R1+R2)
polarity
insulation test
Zs
for that lighting circuit only.
EasyFox is offline   Reply With Quote