mcs

  1. Dan

    MCS Companies List

    Can you reply with all the MCS companies you know of and I'll update this first thread periodically.
  2. C

    Electrician Need For Test&sign My Diy Pv Sys, Don't Need Mcs Reg, Ashford, Kent

  3. C

    Electrician Jobs Electrician Need For Test&sign My Diy Pv Sys, Don't Need Mcs Reg, Ashford, Kent

    Hi everybody, I'm new here and possible my last chance to find somebody to test and sign off before I starting to convert my system to island system. My original plan was a grid connection but I'm loosing my hope to find an electrician in Ashford, Kent or surrounding area to test and sign off...
  4. M

    MCS 012 fire rating in roof systems

    Hi All reading the guide it mentions performance of different panels & how they react, Maybe with all the guidelines & standards we have to adopt they should have had more stringent standards on the panels in the first place & then they would not need the requirement. Evidence has emerged...
  5. G

    31st March deadline for FIT applications for systems with MCS cert issued <16th Jan

    Leeds Solar have just become aware that on 10th March DECC slipped in a Statutory Instrument that takes effect today (31st March 2016) that results in the following urgent issue. All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit...
  6. M

    Pv Battery Storage & Mcs

  7. M

    Battery Pv Battery Storage & Mcs

    HI all just got update in which they mention the following for battery storage. Since the Solar PV Tariff drop, battery storage has become a way to combat the cuts by storing theenergy from the Solar PV installation and using it during the evening or on-peak tariff times. We areaware that...
  8. L

    Installing PV non MCS

    Hope somebody can help I am a time served sparks and a PV installer with all the relevant qualification. I have installed around 250 PV systems and signed them off as I m NICEIC registered. The MCS was dealt with through the companies I was installing for. So here is the question- As the...
  9. S

    NoSolar PV MCS certificate and original installers aren't allowed back on site

    Solar PV Installation. For reasons I can't go in to, the original installers aren't allowed back on site. The MCS Cerificate has not been issued. Is there any provision for an MCS certificate to be issued by a third party, effectively taking over the job? The MCS themselves are fully aware of...
  10. Worcester

    New MCS Consulation > 50kW

    Just received this: I would suggest we all reply to keep it the same. In my opinion > 50kW requires different expertise and would normally be an M&E type contract, don't let these guys scope creep into commercial areas, the whole design and contract process is very different above 50kW. Same...
  11. P

    MCS assesment

    Hello All, I'm in need of some sensible help / guidance. I've just been moved into a new section in work, in at the deep end, next week we have our MCS assessment. All the original details and paperwork are not available for use, the guy who is to become the duty holder is an electrician but has...
  12. uksparks

    Do I need MCS etc?

    Hi, i cant really go into it to much as a bit top secret, but am going into something with someone who has developed something where it needs an Inveryer connecting up that's grid tied a G83 etc so it cuts off and what not etc and so on la de da, anyway, so he wants me took hook this Inverter...
  13. M

    RHI / MCS 4 ASHPs - 4 flats - 4 submeters and 1 main meter (MPAN)

    Hi, I was wondering if anyone has come across this type of situation. I have had an inquiry from a client with a converted house which is now 4 flats all have had individual ASHPs installed, but each flat is on a sub-meter from the original MPAN meter. I understand that the MPAN is recorded...
  14. B

    MCS installation of separately sourced PV kit?

    Hi all, We're planning on having our roof covering replaced when the weather gets better and so thinking of having solar PV installed at the same time. Non-traditional roof so planning on a standing seam metal roof such as Vieozinc as the roof structure isn't designed for tiles. Anyway, I...
  15. B

    MCS/Domestic RHI disconnect

    I think I have bumped into a small disconnect between the two schemes. Architect designed new-build / self-build. I install and commission ASHP and solar thermal. Client moves in a few days later. Client applies for domestic RHI a few days after that. Solar thermal application going through...
  16. jason121

    MCS letter Generation meter

    What will happen to the companies that have left the trade ? MCS has asked that all FIT Licensees send through a list of the addresses that have an incorrectly installed generation meters. The Certification Body will be expected to investigate these cases as non-conformity by the installation...
  17. D

    MCS meter moves

    this morning i had an email from the NICEIC to say that 3 of my solar installations did not conform due to the energy meter being in the wrong place. when i asked for the evidence of this they said the information had come from Gemserv. i then contacted Gemserv and asked them to send me the...
  18. M

    MCS accreditation of PV mounting kits

    The deadline for accreditation expires on 30th of June. Is anyone bothered with it? I know that Hilti got their certification and say that the kit is 4 times stronger than Clenergy's. H
  19. Worcester

    MCS 001 Consultation on MCS Website - Closing Date 30th May 2014

    MCS 001 Consultation – Closing Date 30th May 2014 Dear Colleague The MCS 001 Working Group has made some updates to MCS 001, and we invite comments on the revised document. The relevant documents can be found on the MCS website here. The consultation is open for a period of two months...
  20. M

    MCS Installation database

    A lovely new MCS installation database appeared earlier this week . Good news is that you can download a certificate direct from the site with a simple link. Bad news is that I have tried to upload new projects six times so far and four times I have had to do multiple visits because it is...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock