Hi everybody,
I'm new here and possible my last chance to find somebody to test and sign off before I starting to convert my system to island system. My original plan was a grid connection but I'm loosing my hope to find an electrician in Ashford, Kent or surrounding area to test and sign off...
Csaba Lőcsös
Thread
diy
don't
electric
electrical
electrician
kent
mcs
Hi All
reading the guide it mentions performance of different panels & how they react, Maybe with all the guidelines & standards we have to adopt they should have had more stringent standards on the panels in the first place & then they would not need the requirement.
Evidence has emerged...
Leeds Solar have just become aware that on 10th March DECC slipped in a Statutory Instrument that takes effect today (31st March 2016) that results in the following urgent issue.
All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit...
HI all
just got update in which they mention the following for battery storage.
Since the Solar PV Tariff drop, battery storage has become a way to combat the cuts by storing theenergy from the Solar PV installation and using it during the evening or on-peak tariff times. We areaware that...
Hope somebody can help
I am a time served sparks and a PV installer with all the relevant qualification.
I have installed around 250 PV systems and signed them off as I m NICEIC registered.
The MCS was dealt with through the companies I was installing for.
So here is the question-
As the...
Solar PV Installation.
For reasons I can't go in to, the original installers aren't allowed back on site. The MCS Cerificate has not been issued.
Is there any provision for an MCS certificate to be issued by a third party, effectively taking over the job?
The MCS themselves are fully aware of...
Just received this:
I would suggest we all reply to keep it the same.
In my opinion > 50kW requires different expertise and would normally be an M&E type contract, don't let these guys scope creep into commercial areas, the whole design and contract process is very different above 50kW.
Same...
Hello All, I'm in need of some sensible help / guidance. I've just been moved into a new section in work, in at the deep end, next week we have our MCS assessment. All the original details and paperwork are not available for use, the guy who is to become the duty holder is an electrician but has...
Hi,
i cant really go into it to much as a bit top secret, but am going into something with someone who has developed something where it needs an Inveryer connecting up that's grid tied a G83 etc so it cuts off and what not etc and so on la de da, anyway, so he wants me took hook this Inverter...
Hi,
I was wondering if anyone has come across this type of situation.
I have had an inquiry from a client with a converted house which is now 4 flats all have had individual ASHPs installed, but each flat is on a sub-meter from the original MPAN meter.
I understand that the MPAN is recorded...
Hi all,
We're planning on having our roof covering replaced when the weather gets better and so thinking of having solar PV installed at the same time. Non-traditional roof so planning on a standing seam metal roof such as Vieozinc as the roof structure isn't designed for tiles.
Anyway, I...
I think I have bumped into a small disconnect between the two schemes.
Architect designed new-build / self-build. I install and commission ASHP and solar thermal. Client moves in a few days later. Client applies for domestic RHI a few days after that.
Solar thermal application going through...
What will happen to the companies that have left the trade ?
MCS has asked that all FIT Licensees send through a list of the addresses that have an incorrectly installed generation meters. The Certification Body will be expected to investigate these cases as non-conformity by the installation...
this morning i had an email from the NICEIC to say that 3 of my solar installations did not conform due to the energy meter being in the wrong place. when i asked for the evidence of this they said the information had come from Gemserv. i then contacted Gemserv and asked them to send me the...
The deadline for accreditation expires on 30th of June. Is anyone bothered with it?
I know that Hilti got their certification and say that the kit is 4 times stronger than Clenergy's.
H
MCS 001 Consultation – Closing Date 30th May 2014
Dear Colleague
The MCS 001 Working Group has made some updates to MCS 001, and we invite comments on the revised document.
The relevant documents can be found on the MCS website here.
The consultation is open for a period of two months...
A lovely new MCS installation database appeared earlier this week .
Good news is that you can download a certificate direct from the site with a simple link.
Bad news is that I have tried to upload new projects six times so far and four times I have had to do multiple visits because it is...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc