Wondered if anyone could shed some light on the following;
'add method for adding or removing suppliers & products/materials based on pervious dealings, past history and product approval.'
How did you satisfy this requirement, do you have a points system in place, or is it as simple as saying...
Been waiting for over an hour again for our last MCS certificate. After 2 previously chaotic deadlines and the reduced number of installations going through why on earth can't they get their act together and get the database sorted!!
Is it an MCS requirement for both the AC isolators to be of the rotary type and to be lockable in the OFF position and where can I find details of this, anyone has a link???:dizzy2::dizzy2:
Just trying to find out what requirements the MCS place on solar PV companies. A few come to mind but are they requirements or recommendations? Would be good to see a full list, does anyone know of one?
1. SAP calculation
2. Structural calculation
3. Correct system design
4 Panel testing...
Ok, I decided to post on here after having completed my assessment this weekend with no non-conformities (Woo Hoo!).
So, as I have realised how much of a good source of information this place is; I decided to try and input a little information, seeing as I have been taking so much from here...
Hi
I'm an MCS (NICEIC) and REAL accrecredited PV installer. To date I have carried out a number of installations from start to finish i.e. providing materials, fitting panels, commissioning etc. This means I have also done all paperwork from the initial quotation and contract to commissioning...
I'm new here so please be kind...
If a system is changed after the MCS certificate has been issued is a certificate update required? For example, 2 years down the road and a panel is damaged or an inverter fails and the original item is obsolete and no longer available so a substitute is made...
Third_St
Thread
certificate
change
installed
led
mcs
required
system
update
Hi
I have my mcs inspection in a couple of weeks and have been sorting out the QMS on version mcs1.5 that i have a template for but as i started putting this together about six months ago,I see that there is now a version issue 2 that only has 18 clauses.so when does this actually come in to...
NEED YOUR SOLAR SYSTEM SIGNING OFF BEFORE THE CUT OFF DATE?
WE SIGN OFF INSTALLS IN THE UK FOR ONLY £500 !!!!
CALL TODAY TO ARRANGE A SPOT AS THEY ARE GOING QUICK!
CALL STEPHEN ON 07854246343 or 0166 4566504
+ £100 if located more than 60 miles from leicester
We had our MCS inspection last week and recieved one non com for our a.c isolator next to the fuse board. We used an all in one wylex unit that incorporates a double pole switch, a rcbo, and then the meter. We previously worked for a large company and thats all they ever used and have done 100s...
Hi, im planning to add solar thermal to our accreditations and wondered what mods are required to the quality plan? Has anyone done this!?
many thanks in advance,
Matt
on your Second MCS visit
Is this based still around the ONE solar pv job you will take the assessor to later in the day.
IE Quotes/Sap - Contract - Surveys- Wind Cals - Roof Cals based around the single job?????
or
Will the assessor need access to all documents for all jobs you completed...
Just having a look online at the top rated on google. Most of these websites are so inaccurate, found this on a company that I did think was ok.
http://www.spiritsolar.co.uk/solar-returns-are-still-fantastic2.php
Pushing customers to sign up before C rating EPC ! It's D..........! It seems...
For 2 weeks our Head MCS Mentor will be discussing MCS Accreditation, what's involved, common fears and misconceptions, and for those who have already achieved MCS, the importance of maintaining it, spot checks and your annual audit.
Feel free to ask as many questions as you like.
Looking...
The question is, what would be the out come if an installer dropped out of MCS but continued with its core business if not PV?
Would this be considered as ceased trading for the REAL assurance and a customer would need to act on the warranty insurance? Do you need MCS to continue with...
We are looking for MCS Registered electricians to carry out sub contracting electrical works for domestic, commercial and ground mounted solar PV installations. Please contact us via Pensolar | Solar PV Cornwall or email [email protected] if you are interested. Thanks.
Pensolar1
Thread
electric
electrical
electricians
mcs
registered
wanted
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.