The government published their response to the RHI consultation today, and generally its good news for small systems
ASHP - capped at 20,000 kWh gross tariff to rise to 10.02p/kWh
GSHP - capped at 30,000 kWh gross tariff to rise to 19.55p/kWh
Biomass - capped at 25,000 kWh gross tariff to rise...
Hi,
Hope you all had a good day.
The meter is economy 7 and comes on at 730 to midnight but the customer wants panel convector so he can put them on and off when he wishes. Would he have to get his meter changed so he can use the panel convector heaters in the day?
sorry if its a stupid...
Received today:
Feed-in Tariff rates are index linked and on 1st April 2016 relevant tariffs will be adjusted as follows:
Installations with an eligibility date before 1st January 2016
Generation and export tariffs will be increased by 1.2%.
Installations with an eligibility date on or after...
Hi,
Thanks for reading this and for your help in this matter.
i have a customer that has 4kW on their property and would now like more installed.
the case used to be that they would keep the higher tariff for the 4kW and receive a/the reduced tariff for the remainder.
there was talk this was...
SolarBoy Steve
Thread
adding
current
installed
panel
panels
system
tariff
Suprised no one else has picked up on this over the weekend but lets just say it ruined my Friday night.
DECC reportedly set to launch ?big reset? of solar subsidies ?within weeks? | Solar Power Portal
Having a bit of a brain fart moment guys and would appreciate some input, please bare with me! The domestic economy rate I believe is the new name for economy 7. I am aware that the off-peak time for this tariff varies slightly region/weather depending.
Basing my question on a distant family...
Evening all
i was wondering if anyone has any knowledge of the dimpled quantum range. It has a dual supply one from the off and one on peak.
The installation instructions are rubbish and give little guidelines to the specific cable and mcb sizes only the unit cables are peak 1.5 and off peak...
I've had a look at a dual tariff meter for someone as they believe it has been wired wrong, due to receiving incredibly high bills.
It it should have a standard supply for the flat power and a lower rate for an electric heating board. When I had a look, there are 5 terminals rather than the...
Hi all, a question aimed more at my fellow Scottish members, I've recently moved into a flat that is on the above tariff. I am billed two amounts - heating and domestic, obviously with storage heaters and off peak water on lower rate, and power/lights on normal rate. My question is what rate is...
All feed-in tariff levels for solar PV will remain the same from 1 October 2014 to 31 December 2014.
Ofgem confirmed that deployment in all feed-in tariff trigger bands fell short of enacting an automatic degression, meaning that all FiT rates will remain the same until 1 January 2015...
Hi There, Can anybody give me a bit of advice , i'm looking at putting a small pv system on a stable block with a small wind generator, not sure if this system will need mcs registration , and also if there is any tariff , or is it a case of fitting system and using what you produce !
Thanks D
There's an important quirk in the Feed In Tariff scheme rules that I'm not sure everyone is aware of, but is potentially pretty important...
link
Basically all installations that registered on or before December 31st 2013 receiving an inflation linked increase in the Feed-In Tariff rate they...
According to this :-
https://www.ofgem.gov.uk/ofgem-publications/84190/fitpaymenttable1january2014tariffs.pdf
The feed in tariff is set at the current rate until at least the 1st April 2014.
Hi I have a strange customer who has accepted a 4Kw domestic quote, he has a modern house but is refusing to have an EPC carried out.
It got me thinking does he then qualify for the Middle range of FIT payments or the Lower Range. Any help greatly appreciated.
Hi all
I am looking for ideas for best practice for Earthing Conductors to a dual tariff CU. Should two 16mm Earthing Conductors from the MET be installed, one to each earthing busbar? Or one earthing conductor to one of the earthing busbars and a link of 16mm to the 2nd earthing busbar...
Just wanted to check what others understanding / experiences are with extending an existing system: Customer has a 3kW system on the old 43p and wants to add another 4kW to it (DNO all sorted). Am I correct in saying that the existing system stays on the original 43p tariff and the extended part...
After a bit of digging I managed to find a table on DECC's website that was released last Wednesday that confirms that there will actually not be any solar PV Feed-In Tariff reductions in October, and that the current rates will apply until at least 31st December 2013.
DECC have based their...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.