weeks

  1. V

    British Gas FITS Backlog: Currently 6-8 Weeks

    British Gas Fits backlog is now running at 6-8 weeks. Anyone thinking of British Gas for their FIT's would be best advised to choose an alternative supplier, until they put resources towards clearing up the massive backlog they have.
  2. a12jpm

    Anyone in the Epsom area - board change to price for sister in law.

    Looking for someone in the Epsom area to do a board change and a couple of remedial's on a lighting circuit and ring. I'm about 500 miles away so a bit of a drive for me to do it so get in touch if your interested.
  3. G

    RCD tripping randomly over the past few weeks

    Hi, First post so welcome all and here goes Over the last month the GE RCD has tripped randomly, the last time when we were asleep in bed and nothing more anoying to wake up late as alarm not gone off and all house sockets dead. When i try to reset the rcd it will not reset until i turn off...
  4. G

    This weeks job

    Time for a new cu I think
  5. N

    Builders vans

    I keep seeing builders with 24hr callout on the van. Do people really wake up at 3am and decide they need an urgent extension.
  6. L

    12 week shutdown london

    hi, all anyone else bothered by the 12 week shutdown of all underground and overground stations during which all trades will be out of work as the olympics gang do not want any VIP to see any orange ppe going about their work. total disgrace me thinks.
  7. O

    Help - where can I hire a MFT for a few weeks??

    As title says, my beloved Metrel developed a fault today. I called Metrel and yes they will look at it BUT the turn round time is 14 - 21 WORKING days. So potentially that's a month without a tester, so I need to hire one - so looking for suggestions please! Thanks
  8. M

    Fully qualified, experienced commercial spark needed for office refurb

    Hi There, I am currently waiting to here back from a main contractor to find out whether I have won a decent sized commercial office refurb near Liverpool. It looks as though it is certain, and to start in about 3-4 weeks but just waiting for confirmation. It will be some stripping out and...
  9. G

    what the eletrical workplace has come to....

    latest from jobcentre website for a vacancy in Bury , job description below. Must be fully time served electrician. Must have full driving licence and own transport as will be required to drive as part of duties. Duties will involve carrying out electrical installations in domestic properties...
  10. G

    PV Panels

    We had a 20 panel 3.9Kw system installed on 24th February 2012 just before the good rate ended and the estimated generation on our certificate is 2900Kwh. To date (just 7.5 weeks later), we've generated 700Kwh. Now, I know we've had some great weather lately, but what happens when I generate...
  11. P

    Clarkson evans training

    Clarkson evans training had an open evening last week, wae realy inpressed with the setup and staff, just after some feedback from anyone that has trained with the.
  12. T

    Become an electrician in 4 weeks - Feedback needed.

    Hi everyone, I am interested in hearing from anyone who has attended one of these "become an electrician in 4 weeks" course and how you are getting on since finishing. I don't want to hear from people that have spent 3 years on an apprenticeship only those who have attended one of these...
  13. B

    Hi, been a member for a few weeks, could use some advice

    Hi, since i joined the forum I have been very impressed with the usefulness of the information people offer and have learnt so much. I'm new to the PV industry and could do with some advice. Since joining the industry I have been sent invites to courses, both free and expensive (I have to admit...
  14. F

    How many kW have you installed in Feb?

    Well... Jan was really a slow start, but ever since the announcement on 9th Feb, it has gone a little crazy. How many kW's have you guys managed to install or get booked in before the 3rd of March?
  15. E

    2 Weeks of MCS Accreditation Talk - Gaining MCS & Maintaining MCS - Expires March 1st

    For 2 weeks our Head MCS Mentor will be discussing MCS Accreditation, what's involved, common fears and misconceptions, and for those who have already achieved MCS, the importance of maintaining it, spot checks and your annual audit. Feel free to ask as many questions as you like. Looking...
  16. M

    megger 1720 problem

    my megger 1720has developed a problem its showing ERR 23 phoned MTS who said it was RCD overheating protection What ever that is I havent tested an RCD for 2 weeks now Its away to the hospital to get surgery :(:( Boss is sending me a spare up overnight Im worried about my poor megger feel...
  17. G

    got MCS what next?

    HI all, Well a big thank you to all here basically getting me though my MCS honestly i couldn't have done it without you lot you know who you are. NAPIT have signed off my NC and sent to MCS on friday, she told me i should have it for tuesday and be on there register. So what next. I've...
  18. K

    Conspiracy theory?

    Just a few rambling thoughts on the FIT cuts: Scheme first announced and the "big six" electricity suppliers where tasked with funding the payment of the FIT by raising their prices to pay for it. Fast forward to a couple of moths ago, when the same "big six" had a cosy meeting with the...
  19. S

    ELECSA Certification Scheme ELECSA advice needed please

    hello. I was wondering if anyone could give me some advice to a simple question. How long does it take from booking an assessment with Elecsa till having the assessment? I'm interested in joining Elecsa but I just wondered how long people have to wait. any answer would be great.
  20. C

    cctv system needed , only need 2 cameras, AND HARD DRIVE THAT RECORDS FOR 2 WEEKS

    Can anyone reccomend to me, iv never fitted one but heard theres not much to them, is it just a plug in job or do cables need terminating ? Any help be good cheers

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock