M
Mike Blair
i have to send a 75meter run of a 3 core 25mm armoured from the meter to the fuse board. now due to the lenth i have to have a switched fuse and possibly a isolator on the otherside. due to the earth being 25mm i know alot of isolators only take 16mm.
is the use of a helely block perfered to down size the cable one each side?
is the use of a helely block perfered to down size the cable one each side?