Hi there! I have to do a condition report for a comercial installation. The place have 3 DB with 138 circuits for the whole installation. the installation is new with three years operating. the most circuits are for lighting and sockets with some spurs.
I am a little bit lost for how much I have to charge for it.
Could you give me some advice for calculating the final price?