- Reaction score
- 22
Ihave a job to move a cu. The plan/easiest option is to extend the tails already in henly blocks up into the attic (its a bungalow) across and back down. Works out to be 7m run. can anyone point me in the right direction in the big yellow book where i can find the relevant information on max length and methods of protection.
thanks in advance.
Danny
thanks in advance.
Danny