nlbhoy
I'm looking for some help/guidance with the prices I've put together for a new build development
of 30 houses, I've not yet submitted my bid as I'm looking for some constructive feedback from
anyone who has experience pricing this type of work.
Job is based in Scotland.
I've not had much experience pricing this type of work.
Houses are typical 3 and 4 bed semi's, nothing fancy.
3 bed has around:
23 sockets
8 tv/bt points
3 fans
11 switches
11 pendants
5 smokies/heat
cooker
heating/combi boiler
Main board + testing
gas bonding
mains door bell
I've priced it up per point @
£40 per socket/bt/tv
£100 per fan
£25 per switch
£25 per pendant
£80 per smoke detector
£125 cooker
£150 heating
£300 main board + testing
These prices per point are cheaper than I would usually charge doing extensions/ conversions etc
total price came to about £3500 for the 3 bed semi. I estimated around £1500 for materials and £800 labour. After the 5% retention and 2.5% main contractor discount there would be approx £800-900 profit, not including overhead which is minimal.
Is this to cheap? I would like to get the job as it's around 18months of work, but on the flip side
I would also like to make some money from this.
of 30 houses, I've not yet submitted my bid as I'm looking for some constructive feedback from
anyone who has experience pricing this type of work.
Job is based in Scotland.
I've not had much experience pricing this type of work.
Houses are typical 3 and 4 bed semi's, nothing fancy.
3 bed has around:
23 sockets
8 tv/bt points
3 fans
11 switches
11 pendants
5 smokies/heat
cooker
heating/combi boiler
Main board + testing
gas bonding
mains door bell
I've priced it up per point @
£40 per socket/bt/tv
£100 per fan
£25 per switch
£25 per pendant
£80 per smoke detector
£125 cooker
£150 heating
£300 main board + testing
These prices per point are cheaper than I would usually charge doing extensions/ conversions etc
total price came to about £3500 for the 3 bed semi. I estimated around £1500 for materials and £800 labour. After the 5% retention and 2.5% main contractor discount there would be approx £800-900 profit, not including overhead which is minimal.
Is this to cheap? I would like to get the job as it's around 18months of work, but on the flip side
I would also like to make some money from this.