GBDamo

-
Esteemed
Arms
Reaction score
3,010
Having problems convincing company owner that us doing this is not cost effective/best use of our expertise. We are typically travelling 2-300 miles and working away so I cannot see how it can be cost effective for us to be doing this.



1, If insufficient room/capacity in existing CU then fit a sub board with a 32a and 16a MCB. Max load 8Kw.

2, 6mm T&E from existing/new CU to a rotary isolator on an exterior wall. Load max 5Kw, cable length max 30m, ref method = worst case*, hence 6mm T&E.


A, Worst case, CU at front door, surface trunking to first floor,floor boards up on first floor to run cable to rear, drill trough and drop down to rotary isolator in PVC conduit.

B, Best case, CU in garage, clip direct for 5-10m,drill trough and drop down to rotary isolator in PVC conduit.
3, 2.5mm T&E from existing/new CU to hot water cylinder location. Terminate at a 13a unswitched FCU then spur to a 3a swiched FCU. Load max 3Kw, cable length max 30m, ref method = worst case*.

A, Worst case, CU at front door, two storey, surface trunking to loft and surface mount FCUs.​

B, Best case, CU in garage, clip direct for 5-10m and surface mount FCUs.
4, Test and issue EIC
I'd like to gauge peoples opinion of how long you'd expect to take doing this and how much you'd charge and finally is it the kind of work you'd take on.

All materials supplied by us.

PS - *worst case, cable in a wall and insulated +100mm.

Thanks in advance
 
Having problems convincing company owner that us doing this is not cost effective/best use of our expertise. We are typically travelling 2-300 miles and working away so I cannot see how it can be cost effective for us to be doing this.



1, If insufficient room/capacity in existing CU then fit a sub board with a 32a and 16a MCB. Max load 8Kw.

2, 6mm T&E from existing/new CU to a rotary isolator on an exterior wall. Load max 5Kw, cable length max 30m, ref method = worst case*, hence 6mm T&E.


A, Worst case, CU at front door, surface trunking to first floor,floor boards up on first floor to run cable to rear, drill trough and drop down to rotary isolator in PVC conduit.

B, Best case, CU in garage, clip direct for 5-10m,drill trough and drop down to rotary isolator in PVC conduit.
3, 2.5mm T&E from existing/new CU to hot water cylinder location. Terminate at a 13a unswitched FCU then spur to a 3a swiched FCU. Load max 3Kw, cable length max 30m, ref method = worst case*.

A, Worst case, CU at front door, two storey, surface trunking to loft and surface mount FCUs.​

B, Best case, CU in garage, clip direct for 5-10m and surface mount FCUs.
4, Test and issue EIC
I'd like to gauge peoples opinion of how long you'd expect to take doing this and how much you'd charge and finally is it the kind of work you'd take on.

All materials supplied by us.

PS - *worst case, cable in a wall and insulated +100mm.

Thanks in advance
Lots of worst and best case issues, but what is the job that you have been asked to do, honestly your post is a bit confusing
 
In Olde English I believe;

Looks like Solar immersion Immersion heater control.

The O.P is one of several employees.(we)
His boss has got this install work.
The O.P thinks it's not cost effective and would appear to not want to work away and or do this particular work.

Obviously his boss does otherwise he wouldn't have taken the work.
Crack on.
 
No idea how you think from a distance anyone can give a time scale.
Post is confusing, are you saying you either run a sub to a new board and terminated new circuits there or run new circuits back to existing board.
Why are you worrying about it being cost effective it isn't your company is it?
 
No idea how you think from a distance anyone can give a time scale.
Post is confusing, are you saying you either run a sub to a new board and terminated new circuits there or run new circuits back to existing board.
Why are you worrying about it being cost effective it isn't your company is it?
Westy remember you are a Jedi Spark, and with that comes the power of the Force. Let it be with you always.
 
Lots of worst and best case issues, but what is the job that you have been asked to do, honestly your post is a bit confusing

Really does vary Pete, but it's an 8-16kw (real consumption 3-6Kw) output heat pump at the rotary switch. 2.5mm T&E for immersion and CH controls.
 
In Olde English I believe;

Looks like Solar immersion Immersion heater control.

The O.P is one of several employees.(we)
His boss has got this install work.
The O.P thinks it's not cost effective and would appear to not want to work away and or do this particular work.

Obviously his boss does otherwise he wouldn't have taken the work.
Crack on.

Not, quite. Have a bit more skin in the game than an employee but not enough to force change.
The OP knows it is not cost efficient.
The install work is our own sourced via our own sales, over 500/year. You're right that'd i'd rather not work away but it's not an option.
I'm actually trying to fit more per week by subbing out various parts of the job thus trying to get a handle on time and cost.

cheers
 
No idea how you think from a distance anyone can give a time scale.
Post is confusing, are you saying you either run a sub to a new board and terminated new circuits there or run new circuits back to existing board.
Why are you worrying about it being cost effective it isn't your company is it?

Sorry if it's confusing but the answer to you're question, sub board next to existing CU or as close as practicable, run circuits from their to locations specified above.

cherers
 
I'm mad enough :confused:
1 day best case, 2 days worst
( ducking and covering here now)
Similar to me, straight forward, existing CU, simple runs and it's a steady days work with a nice tidy job.

New CU, floor boards up, trunking and I'd taking a day and a half at breakneck speed.

I know there are almost too many variants to estimate accurately without seeing the job in person, I'm only after ball park figure.

Cheers
 

Reply to Pricing for fitting sub board and running two circuis in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Hi all, Planning on wiring my neighbour's summer house which will be 15 metres away from the end of the house (20-25 metres total distance from...
Replies
29
Views
7K
P
Hi, not been here for a few months and my first visit back is asking for advice, sorry but I need my sanity back!... This is in relation to...
Replies
22
Views
2K
Phoenix
P
B
We have installed some PV at a customers house, and this feeds into a sub board, all this is ok regarding protection, allowable Zs etc...
Replies
8
Views
2K
bumcrack
B
E
I think I've Posted this before, but I've just updated it. Some of the sparks where I work still get a little confused of what the different areas...
Replies
58
Views
77K
M
Hi all, very sorry to bother you with triv. I am in the process of sorting out some pretty shocking electics in a house that has been bodged at...
Replies
0
Views
3K
mbga9pgf
M

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock