Hi all,

Is there an actual regulatory requirement to install consumer metering (e.g. within the main incoming panel board) of the installation either as a whole, or phase by phase, in a new industrial or commercial 3 phase installation? If so what qualifies the such an installation as requiring this?

Thanks in advance.
 
Other than its offence of theft if the supplier doesn't provide a meter.?

Or have I misunderstood your question?

Haha yes lets assume there's DNO metering in place! I'm talking about consumer metering downstream in the consumers distribution equipment.
 
Good question Murdoch but why do we NEED alot of things the regulations stipulate! I guess, for example, there may be circumstances where it is prudent to monitor the usage of each phase, or perhaps the DNO meter might not be accessible to the consumer, or use as a check meter to verify the DNO meter readings. I'm talking purely 3 phase industrial commercial, not single phase or domestic incidentally. Just interested as to whether there are any requirements, sounds like Dave is talking building regs - Part L...
 
Hi Dave, so it sounds like there are requirements in Part L relating to consumer metering?

Yes there is something in part L which requires metering to be installed in non-domestic distribution boards. I don't know the specifics myself but the document is free to view online as it is a part of th building regulations.
 

Reply to Requirement for metering in the Industrial Electricians' Talk area at ElectriciansForums.net

Similar Threads

Hi guys, could someone help with the following please? The scenario is: Domestic property supplied via three phase (with a 3P main DB, NO SPD)...
Replies
2
Views
488
Hello, Looking for some advice following a botched 3 phase upgrade today. Some background: Commercial unit originally fitted out (4 years ago)...
Replies
7
Views
529
Hi all, So my factory needs more power, currently 100A/3p (70KVA) => 400A/3p (200KVA) UKPN wont upgrade existing supply and are insisting on new...
Replies
1
Views
372
Hi there, I built a house with ground source heating 5 years ago and it's a fairly large house so I have 3 phase supply 80 amps per phase. I had...
Replies
7
Views
927
G99 GSI-3 4.4 kw Victron inverter install with EES and batteries and installer can set the export lint if required by dno As part G99 GSI-3 you...
Replies
5
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock