S
snipes
hello,
just been looking on the net for a bit of support on this matter as i carnt get in touch with honey well or vaillant about it . then came across this site and thought i would post ! so hello to all .
iam a qualified electrician wanting an answer to a question on the title above .
the boiler is a vaillant eco tec system it requires a live feed at all times fed from a fuse spur the there is 3 control terminals 3,4,5 . 5 is spare neutral so not bothered about that . 4 is switch live from terminal 10 on wiring block and orange wire on the valves, but what gets connected to 3 ? nothing ? perminate live ? and if so can this be linked form the live feed ? not done many system boilers always seem to be combi
thanks in advance for the replays
this is the wiring diagram for a s plan if it helps
just been looking on the net for a bit of support on this matter as i carnt get in touch with honey well or vaillant about it . then came across this site and thought i would post ! so hello to all .
iam a qualified electrician wanting an answer to a question on the title above .
the boiler is a vaillant eco tec system it requires a live feed at all times fed from a fuse spur the there is 3 control terminals 3,4,5 . 5 is spare neutral so not bothered about that . 4 is switch live from terminal 10 on wiring block and orange wire on the valves, but what gets connected to 3 ? nothing ? perminate live ? and if so can this be linked form the live feed ? not done many system boilers always seem to be combi
thanks in advance for the replays
this is the wiring diagram for a s plan if it helps
Last edited by a moderator: