M
maint77
can anyone help with the following?
a friend of mine said that he is currently having his factory inspected and tested and the contractors have told him that he will have to run in seperate earths on anything using this method as it is no longer an acceptable practice? i thought it was ok so long as it was properly terminated and bonded at the board? any help?
a friend of mine said that he is currently having his factory inspected and tested and the contractors have told him that he will have to run in seperate earths on anything using this method as it is no longer an acceptable practice? i thought it was ok so long as it was properly terminated and bonded at the board? any help?