Discuss Twin & Earth as meter tails in the Industrial Electricians' Talk area at ElectriciansForums.net

P

Phase Con

I have recently joined NICEIC. I have done a few jobs since but got asked to quote to replace a consumer unit. Whilst 'quoting' and doing a inspection of the installation. Bonding, CPC in lighting etc. I took a few photos (as I have crap memory).
The consumer unit is being supplied via what looks like, 6mm twin and earth going to a VOP in the kitchen/utility area before the consumer unit.
I need to give a quote for the replacement, but I need to include replacement of the meter tails aswell?
Any thoughts out there, from those more experienced.Photo 27-11-2015, 15 49 53.jpgPhoto 27-11-2015, 16 01 16.jpg
 
i usually charge £350 for new 10way metal clad fuse board incl. 25mm tails and 16mm earth and usually extra £120 for gas and water bond. any fault finding charge at a hourly rate.
 
I have recently joined NICEIC. I have done a few jobs since but got asked to quote to replace a consumer unit. Whilst 'quoting' and doing a inspection of the installation. Bonding, CPC in lighting etc. I took a few photos (as I have crap memory).
The consumer unit is being supplied via what looks like, 6mm twin and earth going to a VOP in the kitchen/utility area before the consumer unit.
I need to give a quote for the replacement, but I need to include replacement of the meter tails aswell?
Any thoughts out there, from those more experienced.View attachment 30786View attachment 30787

hum.... Is replacing the tails possible? Changing the cu will make the installation safer so may be a note on the cert.

tin hat on
 
hum.... Is replacing the tails possible? Changing the cu will make the installation safer so may be a note on the cert.

tin hat on
I might consider adding heat shrink to cover the exposed cores if it was 16mm, but he's identified it as 6mm so theres really not much choice!
 
for the sake of less than a tenner for a set of tails, get em in. 25mm or 16mm, depends on DNO fuse size.
 
Thanks guys for your comments.
To answer one question: VOT: Voltage Operated Trip. Sorry posted wrong letter earlier.
Found out about one on my NIC assessment, I just assumed it was a RCD
 

Reply to Twin & Earth as meter tails in the Industrial Electricians' Talk area at ElectriciansForums.net

Similar Threads

I'm practising EICRs on friendly locations as I'm still in training - technically done my 2391-52 but frankly need loads more practise. I've just...
Replies
11
Views
772
Good day readers, if any,I am an old sparky, a very old sparky. I can remember old Faraday giving us lectures Wednesday evenings at evening...
Replies
1
Views
356
Hello Need to replace a distribution board in the next few weeks to allow for more circuits to be installed in January. Existing is a TT system...
Replies
6
Views
1K
Hi everyone, A diversity question concerning 2 consumer units fed from 100amp DNO supply Background, So I have an 18th Ed compliant consumer...
Replies
9
Views
2K
I'm in a questions asking mood tonight. I briefely looked at a job today and I need to recommend a board change but need to justify it. Firstly...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock