approved

  1. 9

    scottish spark looking to do my approved

    Not long now been out my time 2 years. Going to download the statement of experience from the Sjib website and get it done Any Scottish sparks done the Aca who can give me some pointers All much appreciated
  2. L

    NICEIC Certification Scheme Is it worth making the switch to NICEIC Approved?

    Afternoon fellas Being January and not as busy as normal I'm just thinking of idea 's to push things on and get more work, I've been non stop for the last few years but with more competition springing up I'm keen to keep busy . A question for the NICEIC Approved guys really, Is it worth the...
  3. K

    Customer convinced that generation meter is not calibrated

    Hi, I have a customer that is convinced that his generation meter is not calibrated and possibly not Ofgem approved. The type of meter we most often install for domestics is a L&G E110 5235 (A in this case). I quit happy the meter is approved and calibrated. For the customers sake we replaced...
  4. S

    4kW now- addtional 4kw when approved by DNO

    Really quick one- If I install 4kW for a customer now but have a DNO request in for 8kW, can I install the 4kW under 15.44 and later on the additional 4kW under 13.99p?
  5. G

    JIB Electrotechnical Certification Scheme (ECS) JIB approved?

    Another jib enquiry to what Is actually required to become approved? I've been trained to 17th edition I qualified 2 years ago and have my nvq3 am2 etc. I've just taken the 2395 but ive been told by someone who apparently called the jib and enquired, that u can't be approved unless u have 2395...
  6. B

    JIB Electrotechnical Certification Scheme (ECS) jib card

    JIB have sent me a ancillary operative card what the hell is that about. Problems problems. No qualifications on the back. Basically it says I'm an Electrical Labourer. Anyone else had this problem. The big con is going to get quite a lot of people next year. Now I have to sign up to NVQ 2356...
  7. W

    *Warning* to Solar PV Sparks & installers

    Don't get involved with Apex Solar Systems/Green Deal (GB) Ltd, Chesterfield (same company) Cowboy roofing outfit with no experience or qualifications in the renewable energy industry, have gained MCS via third party approved contractors with NAPIT (should'nt be allowed). Sub work out to...
  8. S

    Approved Electrician?

    HI I completed my apprenticeship between 1972 - 1976 and passed the C&G 51a and then C&G 51b (14th Edition) I later - approx 1982 got my "Approved Electricians" grade with the JIB. I then went on to do the 15th Edition some time later. I left main stream electrical work for some years, still...
  9. mwigham85

    Approved status

    Hi Guys, I was just wondering if anyone knew if i would be given a JIB APPROVED Electrician card if i had been working as a self employed electrician with 2330 level 3 for 2 years ive have recently got my nvq level 3 and 2394/5 cheers
  10. E

    How to be an approved persone...

    Hi guys. I going to be a competent person for doing consumer units, re-wiring houses. I have 17th edition and insurance. I know I need more to do certificates. I have call to NICEIC and they advice me to do "Initial verification" course. Is all for start? Do I need to do "Part P?" Do I need to...
  11. S

    Want some Guidence?

    Hi 1st post so go easy!Have just won a contract for 4 x 1.5kw systems.So have got to get MCS approved. Any pointers or big no no would be helpful. thanks Paul
  12. E

    JIB Electrotechnical Certification Scheme (ECS) jib regrade help

    hi fellow sparks, i need some help here. i gained my gold electricians card when i was employed back in 2007,full apprenticeship since leaving school 2360 nvq 3 and all that. since then ive been self employed and gained 17th edition and 2391. i sent away for new card and its come back as a gold...
  13. S

    NICEIC Approved Contractor

    Hi all Just a quick question about the NICEIC approved contractor: If I register would I be able to use several electricians to install installations and then have a QS to test and sign off all the work done by them? If I am mistaken what scheme/organisation would I need to do this. The...
  14. B

    Becoming an approved electrician

    Hi all I've been an electrician for about 8 years and I've been getting paid approved rates for a few years but now I actually want it on my card. How would I go about getting it on? Would I need to go and sit a course or if my work wrote a letter saying I've been doing testing etc for years...
  15. W

    NICEIC Certification Scheme qualifications to test under NICEIC

    Hope that someone can help me on this one. I currently work for a housing association as their qualified electician and the company is looking to take on another electrician and also join the NICEIC approved contractors. What is in dispute is the qualifications the new sparks needs. He will...
  16. L

    NICEIC Certification Scheme NICEIC or ECA?

    Hi all, I'm new to EF. I am a small electrical contractor which is currently 'Part P' registered with ELECSA. Although the majority of our work is carried out in the domestic market we are currently picking up a lot of commercial clients. We have now found the need to become an Approved...
  17. A

    approved electrician??

    want to register for a jib card, now what i can make out i can qualify for an approved electrician card?, i have 2330 level 2 and 3, 17th edition, 2391, 2392, also pat testing. i no it mentions about an nvq level 3 but i can get my company to vouch for me as i have worked for them for 2 years...
  18. B

    SJIB (Scottish) Certification Scheme SJIB Approved sparkie exam

    Hi Everyone, looking for a bit of info here. Got my approved exam next Thursday and don't really know what I'm in for, if anybody knows, let me know!? Cheers
  19. Richard Burns

    Comparison of building regs and Approved document P for "special location"

    I was just reading the Building regs (as you do when you are a very sad person:drunk:) and there is a difference in the definition of special location for bathrooms; the building regs state it is within the zones in BS7671, and approved document P states that it is the entire room. This may...
  20. E

    Niiceic approved contractor

    Hi guys, Please don't beat the c--p out of me for posting this thread! I am in the process of joining the above as an approved contractor, coul anyone tell me about the new 2391? do I need to have both parts or will inspection and testing part suffice? i am already part p registered with them.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock