You are using an out of date browser. It may not display this or other websites correctly. You should upgrade or use an alternative browser.
board
Board International S.A. is a Business Intelligence (BI) and Corporate Performance Management (CPM) software vendor known for its Board tool kit. The company was based in Chiasso, Switzerland, where it was founded in 1994, and Boston, Massachusetts.Board International now operates in 19 countries, with around 3,000 customers from a number of variety of industries,
Evening all, I'm relatively new to the trade and have just moved house. Looking to rewire and was looking at a few things, could someone tell me what on earth is next to my board? From what I can see is it looks like two contactors? But what are they likely to do?
Evening all,
I have a little conundrum I need to get resolved.
I’ve moved an EV charger from a single phase board that was on a 40a breaker and no RCD protection, over to a different 3TP board, on a new 40a Type A RCBO (Single phase)
The customer is now reporting that the charger has a PME...
See this time after time - poor installation:
new split load board on a re-wire tt installation. The main switch is not a time delay rcd. The board is metal and there are split load single insulated conductors before the 30mA rcd's.
If these conductors touch the metal work the board may...
I have recently taken on a lecture role at a local college. Their facilities are in ---- state. My aim to rebuild/build a comprehensive fault finding and testing and inspection rig. I cannot find a schematic anywhere. I have the city and guilds one for the test rig, however, I’m after building a...
Hi There
Just a quick one, I'm wondering what's everyone's thoughts on this are.
A subby has clipped a cable to a plaster board ceiling using 3m sticky pads and plastic cable ties, below that ceiling is a number of steel beams spanning the length of the corridor and then below them is a...
Hello All
So I'm not long out of my college days and unfortunately I didn't have a lot of exposure to three phase and commercial wiring systems. I have a three phase switch fuse Isolator rated at 200Amp supplied by the landlord. I need to split this across two Proteus distribution boards, the...
Hi All I'm new here. I have just finished my NVQ and waiting to do my AM2. I have a question on selectivity as it has always slightly confused me, as I've never seen it practically since I started.
My question is will selectivity be achieved if all boards were RCBO's and not RCD's as If there...
I had a call to a new customer who was experiencing what sounded like nuisance tripping on a kitchen ring.
Some background first.
It's an MK LN insulated [i.e. plastic] split load board, with only one side RCD protected. A direct predecessor [I think ?] and very similar in appearance to the...
Do I need any more than this to fit the above board, does it need a fitting kit for the switch or anything extra to get it up and running (tails excluded obviously)
I have a fuseboard change I need to do soon
I’m putting in a FUSEBOX 7 or 10 way RCBO+ SPD
My only concern is how I should run the pyro cables in the board. The board is in a small cupboard in the hallway. I know cables that are not in enclosures need to be double insulated as the pyro cables...
Cant get my head round this :(
I understand N-E faults cause RCD's to trip, but I cant understand why on these 2 occasions, googled allover but no real answer. I have 2 intermittent faults on the go, one Dual RCD board, one split load, 1 RCD.
Dual 2 RCD
Occasionally the left RCD trips when...
Opinions on this Crabtree TP 10 way board? Got to test this next week after a quick recce on a clients site yesterday. Although probably electrically safe the RCCB is feeding everything including another board Fed via an SWA and some external services also in armoured to. Thing that bothers me...
Hi been a while, im writing a report and need to know if there's a specific term for the (?) front of a dist board, as opposed to the inside of a dist board? what im trying to explain is where all the MCB switches are; top of my head it would be something like "console" (probably not thou) or...
Been asked to quote for a job where the small power and lighting needs separate metering.
I’ve not come across this before as I usually only do small commercial, which I believe is exempt from this requirement. Anyone know the actual requirements as per regulations? Anyway I digress.
I...
Has anyone fitted an SPD to a schneider standalone AFDD DB.
Isobar P B Standalone Active distribution board, Acti9, 24 AFDD ways
This board only takes AFDDs so there is no where for the SPD MCB to go. There is a DIN rail next to the main switch. The SPD comes with a separate enclosure.
Acti 9...
What are people fitting in the 3 phase range just lately, I've had a scan at various makes and it seems to be a ---- up between Hager and Wylex at the minute, both are / were decent makes and the RCBO's are reasonably price, things like Merlin are way too dear for the RCBO's.
Also am I right in...
Hello sparkly people
Im a total beginner around how electricity really works.
Ive recently been made redundant from ground works in construction and really not wanting to find the same job somewhere else. Thinking if the electrician path could be a good option for me or maybe just a fantasy😆...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.