  1. westward10

    Carry on Shopping.

    So in Sainsbury this evening and after five minutes or so nearly all the lights go off. The only lighting is from the chilled cabinets, behind the deli and the Argos concession, some areas are pretty dark. All of the emergency lighting still have their charge indicators on so that is another...
  2. R

    How to carry out job in France and Germany

    Hi there, First time poster. I am looking for some advice on where to turn to for a job that I have been asked to carry out in France and another in Germany. I’m based in London. I have checked on my insurance and I’m covered to work there, but how do I/what’s the best way to sign off these...
  3. MattGSW

    Specification of cable to carry power over about 600 metres

    I want to run power to an endpoint about 600 metres away to power some security cameras and some power points. I'll be using a qualified electrician to hook everything up but I'm happy to dig/refill the trench and supply cable and piping as necessary. What kind of thickness of cable would be...
  4. N

    Can I carry out EICR

    Can I carry out an EICR ? Details are - I did serve my time as an electrician in the early 80's I have the SJIB part 1 and part 2 electrical installation certificates and a scotec ONC in electrical engineering,I worked full time in the electrical industry till 89 but continued to do ad hoc work...
  5. J

    Can I carry out commercial work?

    Hi everyone, A quick background to me and my question. I have been working for a commercial catering equipment engineering company for about 10 years and working mostly repairing appliances but also fitting new equipment in commercial premises, Sometimes running new circuits from the CU for new...
  6. B

    PRS registration to carry out EICRs

    It would appear you have to register with the government to carry out EICRs in the private rental sector
  7. Pete999

    Can any of the older members rmember the bits and bobs bags the sparkies used to carry

    As per title I can recall the time when I was an Apprentice, before the time of plastic divider boxes for spares, the bloke I worked with would always have a bg of screws and oddments they have collected, and many times had the job of searching for this and that screw, terminal or whatever...
  8. J

    UK 1mm cable to carry 13a

    My towel heater used to go into a 13a fused switch, which then went into a junction box fixed inside a backbox on the wall. Since re-fitting the bathroom, in order to move the towel radiator, I ran a 1 meter length of 1mm twin+earth cable behind the drywall from the junction box into the new...
  9. Amnesh Singh

    UK Using Armoured as CPC, how to carry R1+R2

    Can anyone please help me, HOW to Calculate R1+R2 on 4 core three phase & neutral SWA, Armour Steel Sheet is Used as CPC. How to fill the Electrical Installation Form. This scenario is in AM2 Inspection and testing filling Certs Exam? Please reply with best answers. Any members those who took...
  10. J

    Sidelight problem

    Good morning, ive just bought a Suzuki carry, which has a problem, the side,rear and panel lights only come on when the right hand indicator is activated any thoughts would be helpful.
  11. P

    I Need Work Electrical testers required urgently to carry out Eicr testing in stevenage and essex long contract

    Looking for electrical testers to carry out EICR testing in stevenage and Essex areas, high volume of works, price work, Applicants must be fully qualified, 2391 , must have own tools and transport
  12. Michael J

    Called to carry out live tests & certify

    I was called by the client to do final live test & issue EIC. Not so straight forward, not all cable chases have been plastered and a couple of areas where boarding has still to be completed. So annoying, anybody else come across this?
  13. A032701

    Tests to carry out prior to new CU

    hi i have been asked to quote for a job where the owner is doing an extension and wants me to do all new wiring in the new part however he wants to keep the existing wiring the same. he also wants to change over the cu to a new metal one (mk probably). What tests do people recommend i do on...
  14. T

    How to bypass an RCD and carry out an insulation resistance test on a circuit

    Hi all. I'm a 4th year electrician currently awaiting to finish my trade test. (FICA in Scotland) the only parts I have to pass is the testing part and fault finding. I'm currently studying testing as this is something I have done the minimum of onsite. Could someone tell me how I would...
  15. TonyJohnson

    Can Metrel EasiTest carry out Earth Rod resistance test on TT System?

    Hi, I have a truck container cafe with a floating generator for power. I am fitting an earth spike to the generator and also an earth spike to the steel container. I then need to measure the TT system i have created but i only have a Metrel easitest.. Will the tester do the job and if so how do...
  16. Gavin John Hyde

    Government propose register of people to carry out EICR

    Just read the monthly newsletter from NICEIC, usual self congratulatory PR nonsense but something caught my eye. The Government are proposing a register of competent persons to carry out EICR's in the private rented sector... now that would make too much sense and assume it would be along lines...
  17. L

    Would you carry out this job??

    Hi guys, Apologies for what may seem a simple question. Ive been asked to do a simple job of installing a couple of sockets locally to DB. But the board has no lid/flap on it. There is RCD protection and 1x 10mm bonding to water and gas which is continuous. Ive advised client they would need to...
  18. R

    How to carry out PEFC and PSCC on a three phase db with a rcd as the supply?

    Ive got my am2 resit tommorow for my live testing and I ran out of time and failed as well as I carried out the ze test on 2 lead high thus tripping the rcd. So now I know for next time to complete this on a 3 lead LOW test and measure ze with earth disconnected etc.. then connect main earth...
  19. C

    What do you need in order to carry out domestic electrical work.

    I am near the end of a apprenticeship(year 3) in industrial and commercial electrics and feel very competent in what I do, I would like to be self employed when I am qualified, and I was wondering if there is any way I can carry out domestic electrical work legally at the weekend for example is...
  20. H

    Should I start working or carry on with education?

    I'm currently studying C&G 2365 and 17th edition and I have no experience at all, I'm not sure whether to carry on with education after this year or if I should jump into finding an employer which is just a whole another story. I've been looking for ages for an employer who could take me on...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock