Hi Take a look at my pictures I want to knock through the wall that the current cutout/meter/consumer unit are attached to. In order to create a...
Hello Can I just confirm that if 90 degree cable is used in switch gear that is only ratted at 70 degrees then you use the 70 degree tables to...
Hey all looking un-successfully for a downlight style recessed wall washer just like the Robus Wilson model which can angle / tilt down up to 45...
Looking for decent outdoor PIR's possible 360 degrees, any ideas? I used to fit some many years go that were 360 degrees and could be wired with a...
Just doing a quote from the new guide, wondering were you find the tables for beyond 45 degrees of South any help greatly appriciated. I have a...
Hope someone can help I'm looking for narrow beam LED spotlights for replacement into Gu10 or MR16 fittings Osram do a product called...
Hi Guys I have a small job lined lined up , basically theres a 4.0 SWA from a RCD shower unit on a 40A breaker run 11m to a 45A switch then 1/2m...
I have two enquiries for solar on commercial buildings, one has concrete beams instead of the normal steel does anyone have any ideas the other a...
Hi, does anybody have any experience or views about these panels. Other than the company's website, there seems to be little additional...
Did an RCD test on a new consumer unit, but got a fail on 1 times, but passed on 1/2times & 5 times. Thought it may just be the rcd so i checked...
Has anyone come across any 45-degree 13A sockets I could use in a kitchen? I'm sure I've seen some somewhere, but I can't find anything on the...
Howdi I have a 32a ring that when I test the RCBO it won't achieve 40ms when tested at 5x in 0 degrees but when switched to 180 degrees it trips...
Hi, I know this might sound a simple question to answer in an exam but in one of the 2391 written papers one of the questions asks "what are the...
:confused: Hi, One of my electricians came across a fault today which we cannot fathom out. New split load (dual RCD) board fitted, all...
Hi guys I have a design question.. The task is as follows... There is a room in my company which holds all the servers powered by a main UPS...
Separate names with a comma.