Hi first post on here i need some advice please.. i have been in the industry for 25 years plus working for various contractors, experienced in every type of installs inc commercial industrial etc.
i went self employed 10 years ago and joined Niceic as a full scope domestic installer.
i have...
bob the spark
Thread
2365
city & guilds
guilds
industrial
niceic
route
units
years
Hi,
Am wanting to remove all bs1363 plugs from the factory, they are not suitable for the oompa loompas we employ.
The problem is I can't find an alternative.
I need a heavy duty plug, that has a fuse built in.
Something like a Harting Han-E but fused.
The alternative is an in-line fuse in...
Evening All,
can anyone advise of the best means of electrically heating an a large area 50x30ft, containing electrical control panels , the aim to prevent any moisture ingressing the electrical equipment( motor pumps etc.
Thanks
Hi guys im just wondering my building supply for my buisness is shared with next door but recently they have been isolating my side of the building which is turning the whole unit side down of my buisness. I cannot gain access to next door regarding me turning it on or stopping them turning it...
mars6394
Thread
industrial
isolation
landlord
meter
property
supply
unit
Hi guys iv got a indutrial roller shutter door at work which will only go up about 2 meters and stops in the same position everytime when you push the up but it will not go any higher but can be lowered n re hightened to the same position and cuts out. Does anybody have an idea what this could...
mars6394
Thread
door
industrial
limit
position
roller
shutter
switch
Customer has two industrial washing machines three phase he wants to install in hotel faceplate indicates three phase 60hz supply needed. Says they came off a ship. Would our 50 hz supply work they are roughly 16 and 18 kamps each.
thekingiam
Thread
attach
customer
industrial
machine
needed
phase
supply
three
three phase
washing
Hi,
A friend of mine owns a small unit, i have the papers from when it was last tested 10 years ago and also 15 years ago, but a lot of its been pulled out since then.
Ill be honest, I do not generally do periodics on this type of building and would like a bit of guidance.
I know how to test...
basically coming to the end of my apprenticeship and im going to get sent out my own jobs soon, ive got most of the basic hand tools - drivers,cutters,croppers,pliers,grips,hacksaws&mini, tape and scaffold level, tin snips, set squares, lump hammer bolster chisel, hammer , adjustable spanners ...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.