Hi,
I know there are many ways to achieve this. I just wanted to know that the diagram I have drawn for this 2way switch would work. Just having neutrals at each point, for future smart switches. Thanks and merry crimbo
Hi all,
I have been asked to install an EV charging point for a friend who doesnt have an electric vehicle but would like either a cable ran in or a charging point installing to future proof his home.
My local training centre runs a course for EV points and I was wondering if the course is...
We have a door that will be in normal use but is designated as a fire exit, however, there are all glass windows site managers that think they know it all has said "can't it go on the wall some three meters to the left" even if building control accept it I don't think it would comply with the...
With the 18th edition coming out, will this just mean more rules broken? Judging by the number of questions on this forum most electricians struggle with the 17th edition! I assume any installations wired under the 17th edition are now dangerous? Mmm better think about rewiring my stables. Only...
I am looking at section 722 of 18th edition for EV charge points. Section 722.411.4 imposes restrictions on the earthing arrangements for TN systems. For an external chargepoint connected to a domestic PME supply the accepted solution to avoiding the restrictions of 722.411.4.1 seems to be to...
Hi guys, I've never done any aerial installs or an data cabling before so bare with....
I have a customer who lives in a block of flats, she has 1 aerial socket in the lounge but she also wants 1 in her bedroom, directly above the lounge. Am I able to just extend the socket in the lounge by...
Guys, i like to have a broad knowledge base and range of work, as i get bored doing the same things day in day out.
From working on F1 hospitality units, to kitting out warehouses, to a little bit of domestic (however i generally hate domestic Re-wires, so rarely do these).
I have been...
Hi Guys,
A debate at work and im slightly confused and thought maybe someone here may shed some light.
What is the point in doing your 2391 Testing course? Apparently to be NIC Registered you do not need to have 2391 Inspection & Testing & You are able to sign work off.
However if you have...
There seems to be a lot of confusion around at the moment as some engineers are flagging up a non-conformity which i had previously never thought about.
Basically I've been sent to a few jobs where its been recommended that an MCP is put on the exit gate to a loading yard? Yes i suppose this is...
I have one in the OSG and I have the BSI IET (size of a yellow pages) regs book. I found this too:
http://www.tisoft.com/en/support/help/electrical/reference/bs7671/tables/table-4a2-schedule-of-installation-methods-of-cables
I've chosen A for air tight conduits in the concrete wall of a...
Hi all I have been sent a few jobs to look at and price for BMS installations
What do you charge per point for controls and power? Do you charge more for longer runs IE over 100m.
To be honest am in the deep end here and would like not to come short at the end of it and hopefully gain some...
Evening all..
I have an editable version of an EICR thanks to Murdoch and also a MWC thanks to Happysteve but I cannot find an EIC. I have looked at the Stroma ones and don't get on with them.
Anyone?
Cheers.
hello i need to sort out damp causing problems for a phone point
my question is ... is how do i disconnect the telephone wires as they are punched in .. i need to disconnect so i can add a pattress box and then re connect ... do i just cut the wires and the punch them back in afterwards ...
alot of lads are coming back to the UK and going to work at Hinkley Point C. Construction sparkies will be getting £300 a day before Tax. My source is from my mate who is supervisor for Laing O'Roukes who are currently building the camp...
Balfour Beatty Bailey Joint venture between Balfour...
Hi,
I assume it's rare, however is there anything wrong against running all of the switches back to a single point along with the light? I see that I would need 3core+E for two of the switches and 4core+E for the intermediate switch and have a junction box to join them all up with the...
Hi folks,
I have a Schneider GET ultimate flat plate phone point to install tomorrow. I had a quick look at the face plate today when I picked it up and am befuddled. The terminals are not screw type nor insulation displacement type either. They look to be some kind of push fit akin to Wagos...
Hi, could some one please explain to me the point at which the feeder stops and becomes a branch on the attached drawing. This is really bugging me and if I had hair it would all be ripped out by now and I am struggling to under stand. Anyone's help would be most appreciated.
Thanks in advance
Hi all,
I have a 32A Final Ring Circuit that I have swapped a single socket to a FSU for an outside light. I'm now testing it and finding it has a discontinuous earth - I'm also kicking myself for not checking from the off but we learn. Anyway from the attached image you should be able to see...
hi all, done a eicr recently and found the following and would like thoughts on the codes? Thinking code 2 but bit harsh to fail the installation on these points esp as its been like it for 30 ish years and no problems or atleast that's what the owner will say!!
Cpc used as live on landing 2way...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.