test

  1. H

    EICR Test Fail, before and after

    Hi, recently had an EICR test done by 'Landlord Certificates' which failed due to circuite 3 having two radial circuits into a single 32amp MCB, they advised splitting it into two 20amp MCB's and quoted £174 including EICR certificate. The Electrian appears to have simply taken out the 32amp...
  2. H

    Wylex RCBO Test - To middle versus bottom position

    Last week I took the opportunity of having the mains power off to test the RCBOs in a Wylex Consumer Unit, fitted nearly 5 years ago, which has the following: 1 off NHXS1B40, 4 off NHXS1B32, 2 off NHXS1B16, 3 off NHXS1B06 and 1 off NHXS1B25 Now on Test, the B40 switch went to the mid position...
  3. 2

    Wiring a switch for an eye test chart (not for commercial use!)

    Hi guys, first time posting, please bare with me! I have an old test chart as shown in the pics that i would like to get running. Everything lights up seperately, the bit at the top/the red and green rings/the white rings/the line of letters at the bottom/the hole at the bottom used as a light...
  4. M

    AM2S Insulation Resistance Test on RCBO

    Hello, I’ve got my AM2S coming up and I’ve been revising like mad but I’m stuck on something. I’ve read that it’s a 3 phase board with just one RCBO for the ring circuit. Assuming they want me to do a global IR test, can I take the conductors out of the RCBO, switch it off, and then test...
  5. L

    Am2s test cert one wrong box(pass or fail)

    I just done my am2s flew though my testing but filled one box wrong on test cert will that be a fail ?
  6. S

    Test bathroom fan power

    Hello I have an old timed extractor fan in the bathroom which has stopped working. It has 3 wires which are black, brown and grey. I believe that these are neutral, live and switched live respectively. At the wall mounted isolating switch (outside the bathroom) the grey cable is sleeved brown...
  7. S

    EM lighting test facility

    Hi, RCBO appropriate test facility for emergency lighting? I have a car storage facility ( one corridor with 10 rooms off the corridor to store vehicles ). Planning to install the row of lighting all controlled from occupancy sensors, hoping to wire in one run of 3 core to tie in all sensors...
  8. HappyHippyDad

    Can I confirm how to test for and how to find a borrowed neutral?

    During some testing I found a N-E IR fault on the kitchen lights of 0.1Mohms. I also found a N-E IR fault on the ring sockets, again 0.1Mohms. This could have been a coincidence, but I disconnected both neutrals from the neutral bar (i.e the kitchen lights and sockets) and tested between them...
  9. E

    RCD tripping on test

    Hi, while testing the new board I installed I got to the live testing at the sockets one of the RCD's kept tripping during the loop test, the other ring tested fine so it's not the tester, the insulation tests where all good. Unfortunately I didn't have a residual current clamp meter with me, to...
  10. KevinH

    Napit Fast test EICR form query

    Has anyone on here using the Napit Fast test software for EICR's noticed that in the section "Extent and Limitations of Inspection and Testing" there is a box marked "Extent of Termination Sampling" which needs to be filled in. This must be a very recent addition, or it's been longer than I...
  11. Z

    What are the causes of unbalance current during no load test of transformer?

    What are the causes of unbalance current during no load test of transformer?
  12. Q

    My OCPD (BS7671 Test Sheet)

    Hi, Main LVAC Board, Directly Fed from a Transformer. What do i put as an OCPD on my BS7671 Test sheet? Since I don't believe the Transformer has a BSEN number? If it Does, Where would i find this? Thanks Again! (Learning and struggling with testing! More complicated filling the sheets in...
  13. O

    Inspect and Test Question

    Hi all, Probs a simple one here but when testing a 3 phase board for ze as part of a periodic inspection plus part initial verification of a small db supplied by this board should I note the main 3 phase ze within the supply parameters section of cert and then the small db as zdb within the...
  14. V

    Test leads giving 0 ohms

    Hi, My Kewtech KT63DL has just come back from its annual calibration without any issues, but Ive just taken it to site and attempted to do the usual nulling of the leads before doing a continuity test and they keep coming back as 0 ohms which they didnt used to do. Normally i had to null them. I...
  15. O

    Getting strange reading when I test a recepticle

    I have moved back to my house i was born in some 60+ years ago. Most of the original house's electrical receptacles are 2 prong with the center screw that holds the cover plate on as ground. They all test, OK. My parents had an addition installed on the second floor sometime around the mid to...
  16. D

    Stage 2 insulation resistance test

    I have installed a circuit for an oven and carried out all of the relevant testing so far. Apart from a neon on the double pole isolation switch, there is no current using equipment connected to the circuit yet as the property is empty. In this situation, would one just make a note on the...
  17. D

    Does anyone use the UNI-T 528 test tool

    I'm wondering if anyone has used this tool. First of all I'm an automotive electrician but my work sent me on a PAT testing course and we have a DeltaPAT mi3309BT unit at work. I was thinking of buying something cheaper like this tool just to experiment with at home. I am 8 years away from...
  18. V

    Is there a way to test a SPD without spending thousands ?

    I know there are many MFT's out there which can test SPD's, but they all cost thousands of pounds, and I personally can't justify that cost which currently isn't mandated. However it would be nice to know that when I install a SPD that it will function. Is there a way of testing such a device...
  19. events-guy2020

    Portable device safety test question

    I have built a portable lighting game, and need advice on what safety testing would be needed for it to be used legally by private clients. In effect it is an enclosure with 10 sockets (only 5 connected, to 5 separate bulbs, connected to a switch), and 20 tails (only 5 connected to power). The...
  20. N

    My EICR test guy says I need to change my bathroom ceiling light to an IP65 rated.

    My EICR test guy says I need to change my bathroom ceiling light to an IP65 rated. Research says I need an IP44. The lamp is about 2.45m above the floor and about 30cms outside the side of the bath. Has he made a mistake or have I?

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock