verification

  1. R

    Initial verification and testing

    Hi All I’m in charge of the maintenance (machinery and facilities) in a plastics manufacturing business. I have a ‘team’ of little old me and an apprentice! We have 7 (soon to be 12) injection moulding machines and 8 extrusion lines, so to say we are busy is an understatement. Anyway, enough of...
  2. B

    Does a CU swap require a full initial verification on all circuits before it can be energised?

    To my understanding it would be ideal to test and inspect before energisation, but it isn't 100% necessary. If it leaves a client without power, it breaches health and safety (no power to safety services etc) or inconveniences them I'd have thought it would be reasonably practicable to turn on...
  3. R

    Initial verification exam help

    Hi this is my first post, I’m looking for some advice I’m doing my Inital verification course as part of my NVQ. I’ve passed the practical part but I’m on my third resit of the 90 min exam. There’s a particular section towards the end based around, “ Being able to test electricial instalations...
  4. F

    Amperis relay testing, testing and verification

    Good morning, I recently decided to buy an Amperis AK-30 three-phase relay test equipment device and although I don't control it well yet, it seems good, since it is able to analyze all types of relays (current, voltage, frequency, power, impedance, harmonics, distance, ...) The truth is that...
  5. C

    C&G 2391-52 course content/delivery

    Hi everyone, Question about 2391-52 (initial verification and periodic testing) A brief background to my situation; I do some in-house wiring for industrial applications, stuff like 3-phase motors, phase controllers, machines into spurs, that sort of thing. I’m not a proper spark & don’t...
  6. BrumElecEng

    2391-52 Initial Verification and Periodic Inspection and Testing Exam

    I sat the 2391-52 Initial Verification & Periodic Inspection and Testing online Exam last week and failed by 1 mark. I got 100% in 2393-10 and 90% in 2382-18 so not unfamiliar with electrical exams. I was wondering: 1. Does this exam follow a sequential format as similar to that of the 2382-18...
  7. S

    UK Initial Verification on large commercial sites

    I'm trying to gauge what the common industry practice is relating to Initial Verification on large commercial jobs. I've been working as a tester for the last few years in the South East, and when I test an installation, I'm expected to correct any minor faults, which I do. As any tester will...
  8. mak

    Sequence of tests in guidance note 3 (initial verification)

    How come the sequence of tests in guidance note 3 is that the Zs test comes before the PFC test? Isn't it normal to do PFC test before the Zs test? Because then you can do your PFC test, put the board cover on and energize the board without coming back to do the PFC test.
  9. S

    Understanding periodic verification

    I had been sent on the NIC Solar PV course last year to learn how to test the DC side of solar installations as my company are testing solar panels in social housing. Due to obvious circumstances the testing work has only started this week and as I completed the course a year ago i'm struggling...
  10. P

    Do you test the suppliers earth conductor for continuity??? (Initial verification)

    Hi guys, QUESTION: Do you test the suppliers earth conductor for continuity??? The guidance note 3 2.6.5 refers to regulation 643.2.11 which requires a continuity check be carried out on all protective conductors including: EARTHING CONDUCTOR, CPC's and bonding conductors. I am aware of the...
  11. T

    Advice on a training company for Design and Verification in East Sussex

    Hello there, I would like to go on and gain the Design and Verification qualification. I live in East Sussex (South East of England) and I'm not sure which training company to use. I've had bad experiences in the past with some places that made me feel like cattle and the person at the front...
  12. A

    2396 design and verification

    Evening folks. Does anyone know how many Mark's you require to pass the written exam. Or if anyone would like to share their experiences on the course and the exam itself.
  13. A

    Initial verification question

    So I've got my 2391... and was always taught and was under the impression that when carrying out R1+R2 tests on all circuits you must carry out the test at all points on the circuit, not the furthest point or a selection of points, I thought the test was to A. Prove a earth path that is suitable...
  14. S

    Initial Verification

    Hi I work in the food industry and I am checking who can do initial verifications after you have installed a system. Also what qualifications if any do you need. I currently Hold 18th Edition, Nvq level 3 and time served. Thanks in advance
  15. Gary Tollison

    Earth fault loop impedance, initial verification, multiple DB

    Hello. Not sure if this is the correct forum to post this in (still trying to work out where the trainee section is). Just been doing some practice fault-finding online. Found this scenario: After doing initial verification on an outbuilding with its own DB, which is supplied from the main DB...
  16. M

    Another play for companoes

    Hi . I have just been informed by a main contractor that I do work for that i need to register with RESET . This is a system for verifying that workers are fully qualified and holds all all workers info skills training QUALIFICATIONS disclosure etc all under 1 roof. As a member of safe...
  17. Daniel Jones

    2396 style question, 2400, short circuit, RCBO,

    hello, studying for my 2396 exam and i need some help! Been banging my head against a wall for hours trying to get this one straight in my mind. The question is as follows: An electrical installation within a small retail outlet, located in a farm building is to be designed with the...
  18. AyresomeBoro

    City and Guilds Design, Erection and Verification (2396)

    Looking to do this course in the new year. Absolutely no-where in the North East delivers the course so looks like I'll have to take a week off work and stay over somewhere that does! Can anyone recommend a decent place to attend? The closer to the North East the better as I assume I will need...
  19. Anthony1674

    City & Guilds 236 prt 2 Initial test and Verification

    Hello all, Can you please advise, I have my C&G 236 prt 1 & 2 and AM1 can you please let me know if I need to complete the C&G 2394 for initial verification & certification of an installation as from what I can remember this was covereded the C&G 236 prt2 course? Thank you, oh and thanks for...
  20. gatuka

    pass mark %

    does anyone know the pass mark for initial verification

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock