J

James1000

A customer of mine has booked a meter upgrade from 100a single phase to a 100a 3 phase meter so we can add an industrial oven to the system.
the supply company have booked to come and fit the new meter on new years eve and I can't be onsite that day.
I'm planning to fit a tp&n board before then and do a full completion certificate on the building which I will leave onsite.
My question is how should I leave the installation so the supply company won't kick up a fuss.
Im thinking of linking the 3 live tails in a Henley block and connecting them all to the single phase meter as a temporary connection If I do this do you think the supply company would remove the Henley block and split the tails into the new meter?
I'm a bit worried that if I'm not onsite that they might find a reason not to fit the meter or reconnect the new board.
Has anyone had any experience of this type of thing before.
Many thanks in advance.
 
Better to be on site if possible as meter fitters will look for any reason not to fit a meter. Most are electrically clueless. You will need to leave the three phase tails and neutral tail suitably labelled ie L1, L2 etc the earth I would connect to the existing MET. Keep your fingers crossed because I would be amazed if it goes well and you could end up with one upset customer.
 
As above.. Do your best to be onsite.. Any excuse their gone.. Wont take you long once the meters in. If absolutly impossible sub it out or change meter change date
 
They should fit tp&n isolator after the new meter (3phase) then connect back all tails in situi, on single phase, then up to you to connect your new 3 phase install into isolator.
 
Could have issues,if in use,meter dudes will not want to shut-down and re-commission,as mentioned,any excuse to exit,including complicated directions to address....
 
New Years Eve? I’ll bet they don’t even show.

Why can’t you attend, would it have something to do with NYE?
 

Reply to 3 phase meter upgrade question? in the Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock