P
piperm
Ok im doing my am2 as u all probably know, i finished my 10 hour composite test today.. i've just missed out on a few times and i wonder
if i get picked up on it ..
Firstly i didnt label the cables in the contator/isolate box for the motor circuit.
Secondly i missed labelling the circuit numbers of the pyro in the DB board even though i've done the other circuits
I didnt get chance to wire the commando socket or do the bond to the water pipe as i ran out of time but i wont get marked down much for this will i??
I didnt put black tape round the switch wire cables in the lighting circuit but i might be able to get away with doing that whilst testing but if not will i get marked down?
I havent thought of anymore at the minte but if i do i'll list them in abit.
____________________________________________________________
Cheers for all the assistance on this thread :-(
if i get picked up on it ..
Firstly i didnt label the cables in the contator/isolate box for the motor circuit.
Secondly i missed labelling the circuit numbers of the pyro in the DB board even though i've done the other circuits
I didnt get chance to wire the commando socket or do the bond to the water pipe as i ran out of time but i wont get marked down much for this will i??
I didnt put black tape round the switch wire cables in the lighting circuit but i might be able to get away with doing that whilst testing but if not will i get marked down?
I havent thought of anymore at the minte but if i do i'll list them in abit.
____________________________________________________________
Cheers for all the assistance on this thread :-(
Last edited by a moderator: