Hi all Friday at last!

Just like to get your thoughts and opinions on this, just been on site today for a new 16 x studio flats over 4 floors in the center there is a donut shaped stairwell and in the center of the donut is a lift access for each floor (check photo)

According to the client (an old school chums uncle) the job had been taken on by a sparky who was never on site and only sent subcontractors to do the work so naturally stood in the stairwell I looked up and saw that there was 1mm singles in 20mm conduit for the beginning part of the lighting circuit going into a light fitting and coming out the other end was 1.5mm T+E clipped direct to thin wood that looked like that had been stuck on with silicon. (this is partially wired from the ground floor to the 2nd floor)

I've always been taught where there is a high public footfall (corridors stairwells) you use FP200 and all round band/metal cable ties in the event there is a fire and the cables would fall if using plastic clips trapping people and the fire services path.

Also some smoke alarms had been wired in standard T+E. Again I've always used red FP200 for smoke alarms on commercial sites but for flats what do you all use?

The whole thing just seems messy! Be good to get your thoughts.Image1.jpg
 
Cables on escape stairwells should be avoided wherever possible, if not they should have ideally have low smoke emission properties but in all cases they should be supported with fire retardant fixings/containment.
What type of fire alarm is it.
 
For an installation of that complexity, and associated costings that will inevitably arise, do you think it is a professional approach to discuss wiring methods, like what type of cables have been used etc?
For a job of this size I would have expected some sort of construction consultancy to have been employed.
Cable types, cable routing and cable fixings, should have been discussed at the planning stages.
Personally I think it's a wrong move at this stage as to what we all think, what should be used and the installation method, should have already been decided, just because it's a family friend bears no consequences to the methods, and costings used, sorry for the bluntness of my reply, it smacks of someone wanting a cheap job imo.
 
as pete says, the installation should have been specified by the project manager in consultation with LABC, Fire Dept., and any other interested bodies.
 
Hi Guys, thanks for your feedback as always, but I haven't done any of the work on this install. This is just me walking around having a visual inspection of what has been done so far on the request of my friends uncle, as he has had a falling out with the sparkys who did all the work so far.
 
I would not have thought a Part 6 system, assuming that is what it is would be appropriate.
 
Surely the architects plans state the alarm type and grade .......

Sounds like some corners have been cut.

I don't doubt that, I asked to see the technical schedule and specs all they could give me were drawings of the floor plan, if he didn't skimp and use these cowboy wiremen he wouldn't be in this situation. Anyway he wants me to help out until he can find another spark to work on site.
 

Reply to Cable preference for corridors and public access areas in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

I have a job coming up where I likely need to replace old twin and earth (imperial size) feeding one, perhaps two flats in a 3 storey converted...
Replies
20
Views
2K
Hi everyone Ive just had an electrical condition report conducted on a mixed-use property, and I am extremely surprised that after the last report...
Replies
11
Views
2K
  • Locked
  • Sticky
Beware a little long. I served an electrical apprenticeship a long time ago, then went back to full time education immediately moving away from...
Replies
55
Views
5K
Morning all So the site I'm based at recently had some work done (think partitioners). This package of work included electrical. This was...
Replies
44
Views
8K
Anyone got a solid answer on what the legal responsibilities are of building management companies when it comes to certifying their part of an...
Replies
4
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock