- Reaction score
- 194
I have one in the OSG and I have the BSI IET (size of a yellow pages) regs book. I found this too:
http://www.tisoft.com/en/support/he...a2-schedule-of-installation-methods-of-cables
I've chosen A for air tight conduits in the concrete wall of a swimming pool, E/F for the lights above the swimming pool since I assume my suspended lights will have the cables on tray and I'm not sure what to go with for the changing room lights.
100 and 101 seem to say the same thing but have different values, should it be one of those two?
Any and all help much appreciated.
http://www.tisoft.com/en/support/he...a2-schedule-of-installation-methods-of-cables
I've chosen A for air tight conduits in the concrete wall of a swimming pool, E/F for the lights above the swimming pool since I assume my suspended lights will have the cables on tray and I'm not sure what to go with for the changing room lights.
100 and 101 seem to say the same thing but have different values, should it be one of those two?
Any and all help much appreciated.