H
highspark
Would a C3 be adequate for a main protective bonding conductor connection to water not readily accessible?
Connection is present (along with tag) but is under floor boards. Took me ages to trace it back.
Also I can not verify the location of the gas bonding connection. What code?
Connection is present (along with tag) but is under floor boards. Took me ages to trace it back.
Also I can not verify the location of the gas bonding connection. What code?