How do they like to see isolation "proved" when there is nowhere to prove it after an isolator is switched off (ie. DP islolator between meter and CU with sealed cover)? A proving unit is the obvious answer, but without one do they accept switching the isolator twice to "prove" it was dead and tester was working after?
 
I just got the date for my niceic renewal this morning. It's not till next month but can start to fell the stress about it already, although you know you do everything and know why you do things u just feel they are trying to catch u out and the mind goes blank and you turn into a jabbering mess lol
 
How do they like to see isolation "proved" when there is nowhere to prove it after an isolator is switched off (ie. DP islolator between meter and CU with sealed cover)? A proving unit is the obvious answer, but without one do they accept switching the isolator twice to "prove" it was dead and tester was working after?


prove it as you said on known supply if not having a test rig!..... also i was also taught in navy that once you have proved dead and others are working on the equipment you should "touch" the busbar to show its dead...
 
My last assessment took 45 minutes (excluding drive to and from site) unfortunately that assessor has long since retired now..!

lol.... im not worried one bit! my work is top quality (apart from a few wago joins in cables that's to the best efforts of plumbers and torches and joiners with power drills...!)
 
I just got the date for my niceic renewal this morning. It's not till next month but can start to fell the stress about it already, although you know you do everything and know why you do things u just feel they are trying to catch u out and the mind goes blank and you turn into a jabbering mess lol
the only stress you should be feeling is the weight of coin in your wallet dragging you down.....oh they`l soon have that sorted though....
 
Is this your 2nd assesment durham? mines coming up with elecsa soon, theyve already took the Annual fee out my account! just waiting for the letter, could you let us know how they are with the paperwork side of things? i have been slacking in doing any risk assesments/method statements and getting that customer consent form thing filled in, all the BS really, as far as certs go i keep all them in a box file!!
 
way i see it...!

British Gas = ECA (Elecsa)
Durham County Council = Napit

the movement is happening away from the NIC!!

unless you are tendering for contracts written by old farts with no sense of upto date goings on then NIC is unfortunately the only way to go... the contracts and tenders are based on templates written many moons ago..!
 
Is this your 2nd assesment durham? mines coming up with elecsa soon, theyve already took the Annual fee out my account! just waiting for the letter, could you let us know how they are with the paperwork side of things? i have been slacking in doing any risk assesments/method statements and getting that customer consent form thing filled in, all the BS really, as far as certs go i keep all them in a box file!!
well they give you all this flim flam about risk assessments and a health n safety document....all b****ite....all they want is the ching...lol...
 
Is this your 2nd assesment durham? mines coming up with elecsa soon, theyve already took the Annual fee out my account! just waiting for the letter, could you let us know how they are with the paperwork side of things? i have been slacking in doing any risk assesments/method statements and getting that customer consent form thing filled in, all the BS really, as far as certs go i keep all them in a box file!!


3rd year mate...! yeah i dont keep any of that paperwork as its surplus once complete! i really need to be doing more contracts though!
 
way i see it...!

British Gas = ECA (Elecsa)
Durham County Council = Napit

the movement is happening away from the NIC!!

unless you are tendering for contracts written by old farts with no sense of upto date goings on then NIC is unfortunately the only way to go... the contracts and tenders are based on templates written many moons ago..!
the local authorotys are supposed to spread work arout all the part p scheme providers....we all know they dont.....brown envelopes....undertable cash (wife) swaps....who knows what goes on at the annual council dinners...
 
way i see it is thatthe "crap" work will be dished out and the "lucrative" work will be kept in house or tendered to the big boys at teh dinner table!
 

Reply to Elecsa Renewal Tomorrow!! in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Similar Threads

As a non-electrician (I make the tea in the forum imaginary office, I think the tea is real though) I wonder, is there a way to avoid a...
Replies
6
Views
475
Hi, I had been with Elecsa for years as a Part P installer/tester. Then they were taken over by the NICEIC. I'm embarrassed to say that I hate...
Replies
6
Views
1K
NICEIC Certification Scheme NICEIC renewal assessment debacle!
Hi All, I recently had my NICEIC renewal assessment. We are a two man band. We only carry out small local work and we are approved contractors &...
Replies
14
Views
6K
Looking for a bit of advice from the wider audience / those who may have done similar before. I entered the game a bit later / in a non...
Replies
12
Views
639
Hi, I would like to do some minor domestic electrical work while I am completing my NVQ level 2 in electrical installations. I have the 18th...
Replies
11
Views
5K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock