Just wondering if anyone would like to share a few tips on the techniques they use when working out quotes on domestic jobs
* working out lenghts of of cable required
* methods of calculating labor
* etc etc.
I tend to use the technique
Number of points multiplied by the estimated time to do each point, multiplied by hourly rate, plus overheads and VAT, with a bit on top to cover waste & changes etc.
If anyone has ideas on how to improve on this please share Im always open to advice