Discuss FIRST HOME - Help with new Consumer Unit in the UK Electrical Forum area at ElectriciansForums.net

Once again, that statement simply isn't correct. RCD is a generic term for all residual current devices which includes RCBOs.

:weary: I thought it was pretty obvious I meant a double pole type of RCD used to make a ccu split load or 17th edition......... But you are absolutely right to pull me on it. (And technically correct is of course the best kind of correct :tonguewink:)
I apologise for my tardy parlance and will strive to be clearer in future. :laughing:
 
What guts?

And wasn't you waffling on about no such thing as non combustible the other day? :tearsofjoy::tearsofjoy:

Honestly the people that post on this forum, you wonder it they ever worked in the real world ! :flushed:

By guts I am referring to the internal parts of the CU.

I don't know if I was 'waffling on' but yes I have often commented on the fact that everything is combustible if exposed to the right conditions.
If and when I make that departure from the regulations I do so after considering the individual situation, not as a one size fits all solution.
 
What guts?

And wasn't you waffling on about no such thing as non combustible the other day? :tearsofjoy::tearsofjoy:

Honestly the people that post on this forum, you wonder it they ever worked in the real world ! :flushed:

By guts I am referring to the internal parts of the CU.

I don't know if I was 'waffling on' but yes I have often commented on the fact that everything is combustible if exposed to the right conditions.
If and when I make that departure from the regulations I do so after considering the individual situation, not as a one size fits all solution.
 
Is the existing board metal clad?? If not then the board needs changing to comply with current regs.

To give my opinion;

If the replacement items change the original installation, e.g. dual RCD to fully populated RCBO's, then I would consider that a significant change to the original installation, therefore would need to comply with current regs (i.e. 421.1.201).

If the installation was the additional RCBO or two, then it would not. We did have a recent debate on moving a plastic CU from one room to another, which I think came out 50-50.

As I said earlier, it is probably more financially viable, to install a new A3 fully populated CU, than just buying x amount of RCBO's to install into a plastic one.

Bottom line is, there is no one who can tell you how to interpret this reg in these circumstances, and unless you find yourself gripping some bars, being questioned about your reasoning, you can do what you think complies with this reg. :)

Edit; you could ask your scheme if your in one, but I suspect they would bat it back to you, and say it was the designer to make the decision.
 
Really? please explain.
Let me explain, you are moving the board from one location to another. You will be disconnecting all the cables and supply to the board. You want to strip the board down so you can try and fit suitable rcbo's. You are installing it in a new location. You must comply with current BS7671 regs. The work must be notified to LBC. The work must be done by a qualified Electrician who is a member of a scheme so the work can be done properly, to current regs, certified and notify LBC. If you want yours electrics done right and have no issues later on if and when you want to sell the property then pay a qualified Electrician to do it right, if your not going to do that then stop asking questions on here and ask your own Electrician who's charging you £250 and on about installing a sub standard board. Good Luck.
 
Let me explain, you are moving the board from one location to another. You will be disconnecting all the cables and supply to the board. You want to strip the board down so you can try and fit suitable rcbo's. You are installing it in a new location. You must comply with current BS7671 regs. The work must be notified to LBC. The work must be done by a qualified Electrician who is a member of a scheme so the work can be done properly, to current regs, certified and notify LBC. If you want yours electrics done right and have no issues later on if and when you want to sell the property then pay a qualified Electrician to do it right, if your not going to do that then stop asking questions on here and ask your own Electrician who's charging you £250 and on about installing a sub standard board. Good Luck.

I,m more in the camp of post #50.

Your making it sound a bigger job than it actually is. Existing CCU is perfectly up-gradable.
 
i may be wrong here, not having used a starbreaker board for ages, but aren't some of thos busbar slots Neutrals for the D/P RCBOs?
 
I,m more in the camp of post #50.

Your making it sound a bigger job than it actually is. Existing CCU is perfectly up-gradable.
Do what you want, I've only been doing Electrics for over 20 years, done an apprenticeship etc. What do I know, but don't come posting on here when you can't get it signed off because you have used a plastic board and not a metal clad one as per the regs but what the hell, just do what you want.
 
Do what you want, I've only been doing Electrics for over 20 years, done an apprenticeship etc. What do I know, but don't come posting on here when you can't get it signed off because you have used a plastic board and not a metal clad one as per the regs but what the hell, just do what you want.

:joycat::joycat::joycat:Calm down mate, Ive been doing it a fair bit longer than you and know what i,m talking about.
The op is fishing on various sites for info........does the mystery polish electrician exist? I doubt it. I'm just debating whether the existing ccu can be re used.

No starbreaker are not obsolete.
 
i stand corrected. just was looking at a couple of RCDs i have in stock from a strip-out. 2 porongs, but the N is separate so those 2 prongs must both be L's. if that makes sense.
 
:joycat::joycat::joycat:Calm down mate, Ive been doing it a fair bit longer than you and know what i,m talking about.
The op is fishing on various sites for info........does the mystery polish electrician exist? I doubt it. I'm just debating whether the existing ccu can be re used.

No starbreaker are not obsolete.
Sorry I thought you where the OP, my apologies, he just needs to sort it out with his electrician and stop posting on every forum under the Sun, again sorry, I've had a carp day with a carp CPN board that shouldn't even be allowed to be sold.
 
Sorry I thought you where the OP, my apologies, he just needs to sort it out with his electrician and stop posting on every forum under the Sun, again sorry, I've had a carp day with a carp CPN board that shouldn't even be allowed to be sold.

No worries mate, it can get confusing who says what!

Can't stand those cheap boards, CPN, BG etc i think they are the reason Amendment three was introduced! Is CPN Citys own brand?
 
in ref to post #75 yes but the 1 module ones fit. the bus bar is continuous in these boars, they had plastic inserts in the split load ones but this is a straight bar so nothing else in the board needs changing. lets face it its not going to get a certificate on anyway that's even if this polish electrician exists, I would much sooner a DIYer use that crabtree board over a new BG one as he's got a third more connections to potentially leave loose with his neon screwdriver!
 

Reply to FIRST HOME - Help with new Consumer Unit in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Trying to organise a CU replacement at home. It's a 1930s property. It's got a 10way CU but with no RCD protection. Was after a larger unit with...
Replies
65
Views
4K
Hello, Is there an actual age limit on house wiring that would prevent a traditional fuse box being replaced with a consumer unit please...
Replies
8
Views
988
Currently I have a Henley block which has 2 consumer units. 1 of these CU feeds a garden supply and garage. Out in the garden which is fed by a...
Replies
4
Views
1K
Hi Everyone, Last year arranged for my mother's and my consumer units to be changed by the same electrician who is NICEIC registered. Both jobs...
Replies
20
Views
2K
Hi, if getting back to the CU is not an option, instead of spurring off a socket via a Sfs putting the rating down to 13a. Could you spur off the...
Replies
43
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock