Cant see how 2 people can do 4kw
Roof and electrical ???

The lads i have working for me have been
Here between 6- 10 years , we used to rewire
Social domestic houses in a day in 2009 we had
3 teams rewiring a property a day. What am
Saying is the employes i have are fast and get there heads
Down. But to do one 4kw in a day between
Two I honestly cant see it ! Every house
Is diffrent cable runs can take a day for one
Person somtimes !!!
 
Rosemary tiles - piece of cake!!! Fastest roof job we've done in months! 3 broken tiles but 2 were already broken.

For this job - 1 spark for a day and 3 roofers for 6 hours. I have no idea why this one, with awkward cable runs has been done so quickly!
 
I honestly can't see the need for 3 roofers! We only use k2 or shucko rail! Always sit down with customer at the end of the day etc! Just shocked lol!

Todays job was 22sharp 180's on a slate roof with a platinum 3800 inverter, cable run was external tru stone wall to loft, all shucko rail etc started at 8 finished at 4! No broken or cracked tiles, even replaced the two that were missing befor we got there!
 
Last edited by a moderator:
All hooks flashed in? How on earth can you do that and the electrics & testing with 2 people? Why no flexi slate MCS states drilling through and filling isn't acceptable. Maybe I've got it wrong ...
 
Last edited by a moderator:
This all seems very strange, I am sure you all work very hard, but for 2 people to do the work of 4 people in half the time???
Different standards maybe, maybe the 4 man teams always get difficult installs to do?
Maybe the 4 man teams are in each others way, could that be it?
Generally though, in any manual job, those that take their time and are conscientious, their work is to a higher standard.
Also having the right tools for the job helps, and being organised and prepared with the right materials can speed a job up.
My other half always say's "take your time and do the job properly".....:rolleyes2:
 
4 kw Roof Mounted

Bunglow - 2 men Full Day
House - 2 Men Day and half

Bunglow 4 men - 4-6 hours
House 4 men 5-8 hours

Problem with house's All are diffrent unless its social domestic
 
2 roofers, 1 spark, me running about making clucking noises!
2 days usually, mainly cos the roofing guys don't have huge experience and I'd rather they do a good job than rush. They're good lads so I'll take the damage on the extra day.
 
Doing my first install now, me and a friend have clocked up 3 days already - angle grinding the nubs off the pantiles was most of a day! Still two days to go I reckon, and that's before I've even started on changing the metal non-cpc'd light fittings downstairs and in the bathroom! (Part P and MCS assessment combined.)
 
your first ten installs take twice as long as your second ten which take twice as long as your third ten.

3 days for your first is sensible, glad to see your taking the trouble to dress the tiles!
 
God when I was doing the pv systems it was two roofers for hard a day and me and the electrician where proberly there the same we where DOIng two maybe three jobs a day
 

Reply to How Many People on Site? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Similar Threads

My best mate has been medically retired from the prison service at the young age of 52 and has time on his hands :D He's looking at a 'plug in'...
Replies
7
Views
406
I spend a lot of time renovating vintage broadcast radios, military radio and test equipment. At present adding panels to our off grid...
Replies
10
Views
1K
Hi I have three phase installed recently to increase generation. DNO approved the extra 2 solar arrays so we have 3.68KW FIT on one phase and 8KW...
Replies
1
Views
676
Have you got any plans for the long Easter weekend? Here in the UK Friday and Monday are both Public Holidays so a lot of people have a break or...
Replies
6
Views
183
Sorry if this is in the wrong place. I'm an electrician of 20 years. Starting out with domestic and commercial install work but mainly working in...
Replies
16
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock