waynelester
hi,i generally do domestic but have the opportunity to quote for a small industrial job.a mate of mine is the boss at a fabrication company and they have manufactured a steel cabinet to house pumps and equipment.the customer has asked for domestic services comprising of lighting and a frost stat heater to be fed fom a distribution board installed inside the cabinet.the job is quite straight forward and i intend to install a 4way metal cu with rcbo"s and run in metal conduit.my query is what test cert should i put on it as it will be connected to mains by the customer,all iam required to do is supply the cu and install the circuits. also what type of light would you recommend to be installed inside a steel cabinet.any advice greatly appreciated,thanks