Discuss Last job of the day... in the Electricians Chat - Off Topic Chat area at ElectriciansForums.net

T

Tidy Max

Has anyone EVER had a 5 minute job? I have heard a lot about them but i am yet to see or do one.

Last job of the day, 8pm, change a light fitting. Got there, whole house had been freshly plastered and decorated, along with the frigging ceiling rose. Managed to score around it until it was loose however it then became apparent that the thread had been caulked up.

.......Its amazing what a hammer can do.
 
i get told that the job will only take 5 minutes on your way home by someone sat infront of a computer and as soon as it hits 5 oclock they are gone. none of them take 5 minutes
 
Nono, the lump hammers in the sin bin after it accidently smashed my knuckles on Sunday. It started with a hammer that looked suspiscously like my snips, then turned into the claw hammer.

Considered just wrapping my hands around the sodding flex and 'tarzaning' across the room.
 
The dreaded 5 minute job
It does not exist,so how come it can always causes rage
icon8.png

icon7.png
 
I had one once. Had to replace a fast fix box in an office which I noticed while I was there doing something else. I did it out of hours because I didn't like the idea of switching breakers off when there were people (solicitors) working on their computers, even though a similar socket (both were cleaners sockets) was labelled with a circuit number (we all know what assumption is the mother of all). The boss said he thought it'd take longer than expected because of something to do with being wired in singles in kopex.
I went in mentally prepared for it to take a couple of hours, there was still someone working, who I told what I was going to do in case they wanted to save their work.
Plugged in my Buzz-it, turned off the circuit which I suspected was the right one and to my surprise it was.
Whipped the socket plate off, hoiked the box out and the kopex came with it. 20mm hole in new backbox, adaptor screwed to box, box back in wall, connected up socket, quick test, job done in little more than 5 minutes.

So they do exist sometimes.
 

Reply to Last job of the day... in the Electricians Chat - Off Topic Chat area at ElectriciansForums.net

Similar Threads

This drives me round the twist, the client tells you what they want, kind of. you do the work the way the client asks you to and then when its all...
Replies
13
Views
2K
Morning All I recently completed my first re wire and board change, (with help from the owner who is a gas fitter and plumper, who works with my...
Replies
0
Views
1K
Working on a full rewire at the moment that's been dragging on for some time now. I got the job through a builder I know and it's the second job...
Replies
24
Views
5K
Hello i've recently just had a re wire done on a three bed semi house, Ive noticed a few things im not 100 percent on ive spoken to the firm that...
Replies
24
Views
5K
So I just got let go from my job last week as operations manager was in the role for 6 months, previously I was a transport supervisor at...
Replies
20
Views
4K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock