D
daiplayer
am now working on a property ( installing a second shower)
due to the load change . 2 x 8.5 kw showers = 74 A
And the main income only being 63A main fuse , 16mm tails. I need these upgraded .
Do i need western power + the suppliers out to do both sides ? ( ie after /before the meter ? )
Many thanks
due to the load change . 2 x 8.5 kw showers = 74 A
And the main income only being 63A main fuse , 16mm tails. I need these upgraded .
Do i need western power + the suppliers out to do both sides ? ( ie after /before the meter ? )
Many thanks