J
johnstantine
Hi everybody I'm new to the forum.
I need some help with a small problem concerning PME.
I'm putting in a supply to a 32A commando socket, located on an outside wall, about 30M from cu to be used for a hot tub, there is a 30mA RCD at the cu and the supply to the house is PME. The suppliers of the tub have said the tub is class 1. I know there's a general conflict of opinion with PME outside but I'm using the job for an assesment for my NICEIC domestic installer and am interested on what there opinion is on how the PME should be dealt with. Do they say to convert to a TT, or leave as PME but install an electrode as well, or simply leave as PME.
Any comments gratefully received.
Thanks
I need some help with a small problem concerning PME.
I'm putting in a supply to a 32A commando socket, located on an outside wall, about 30M from cu to be used for a hot tub, there is a 30mA RCD at the cu and the supply to the house is PME. The suppliers of the tub have said the tub is class 1. I know there's a general conflict of opinion with PME outside but I'm using the job for an assesment for my NICEIC domestic installer and am interested on what there opinion is on how the PME should be dealt with. Do they say to convert to a TT, or leave as PME but install an electrode as well, or simply leave as PME.
Any comments gratefully received.
Thanks