Hi guys,, basically I work for a firm and we specialise in care homes so there not part p registered,there a member of eca though. I'm fully qualified with 2391 also.
My uncles having a house built and wants me to wire it,, as I'm not part of a scheme do I need to tell building control. I asked them and they want £360 is there any way around it?? As joining stroma would be cheaper than that. Surely there's a cheaper way?

Thanks
 
a new build will have building control involved from the start. they usually accept your certificate once they have seen copies of your quals., inc. 17th (2382). phone them and confirm.
 
A building control customer of mine told me (some while back) that the high fee is to discourage people from bothering them about the electrics, set as high as they can get away with in the hope nobody does.
 
all that the stupidly high fee does is to drive notifiable work underground and not be notified.
 
Look at the local authority website and check what their terms and conditions are, most will write in that if a self certifying electrician is not used under part P then they will charge a fee to cover their third party costs. There should be a document on the website explaining charges and also supplementary charges. There are so many different policies it is difficult to give an exact answer. My advice would be to speak to the building control officer.
 
most BC's will accept a cert from a non cps member after seeing copies of his/her quals., where the job is part of a building project that is already subject to BC. this is because they have already factored in the electrics as part of the project and have raised a building control notice.
 
Look at the local authority website and check what their terms and conditions are, most will write in that if a self certifying electrician is not used under part P then they will charge a fee to cover their third party costs. There should be a document on the website explaining charges and also supplementary charges. There are so many different policies it is difficult to give an exact answer. My advice would be to speak to the building control officer.
Well there's another issue all these local authorities have different terms. Out of interest can you expand on the above of the self certifying electrician not under part P I take it you mean not with one of the schemes. what is their 3rd party costs regarding ?
 
Well there's another issue all these local authorities have different terms. Out of interest can you expand on the above of the self certifying electrician not under part P I take it you mean not with one of the schemes. what is their 3rd party costs regarding ?

This is a constant bone of contention on many forums but fairly easy to explain, although someone will no doubt pop up and tell me I am talking carp :)

Yes there may be someone who has sent them their qualifications and allowed them to sign off with an EIC but this is the exception rather than the rule. Just look at building control as a business who are legally responsible for the work they are signing off and try to run at a profit not a loss. Different councils have different budgets, different staffing etc etc. If electrical work is signed off by a scheme they have zero responsibility and zero costs, if they accept your qualifications and it goes wrong they are ultimately responsible, for this reason most councils will cover themselves by getting a third party sign off which costs them money. Some councils employ someone with a test and inspection background, a council near me has such a member of staff so they can undertake supervision of electrical work. The interesting question is if someone sent in an EIC to building control along with their qualifications and this was accepted, legally surely they would be responsible for that installation (would need Pli to cover the installation etc)

Councils charge on the basis of work they anticipate they will undertake during the build, most councils will state in their terms and conditions that all building inspection is priced on the assumption that any electrical work will be subject of design, installation and test certificate by an electrician who is a member of a competent person scheme. They will then go on to say that if it is not, they will make a supplementary charge which will reflect the costs incurred by them in instructing a third party competent person to undertake the necessary site visits and inspections which are required. This is to cover inspection of design, site visits to check work during inspection at first fix, inspection and text at completion. All councils set their own building control charges, as a customer you don't like them you are free to use any other independent third party inspectors. The golden rule for me when dealing with building control is to speak directly to understand what they require. Alternatively go on their website, there are very few which do not publicly outline their fee structure and requirements.
 
Well there's another issue all these local authorities have different terms. Out of interest can you expand on the above of the self certifying electrician not under part P I take it you mean not with one of the schemes. what is their 3rd party costs regarding ?

This is a constant bone of contention on many forums but fairly easy to explain, although someone will no doubt pop up and tell me I am talking carp :)

Yes there may be someone who has sent them their qualifications and allowed them to sign off with an EIC but this is the exception rather than the rule. Just look at building control as a business who are legally responsible for the work they are signing off and try to run at a profit not a loss. Different councils have different budgets, different staffing etc etc. If electrical work is signed off by a scheme they have zero responsibility and zero costs, if they accept your qualifications and it goes wrong they are ultimately responsible, for this reason most councils will cover themselves by getting a third party sign off which costs them money. Some councils employ someone with a test and inspection background, a council near me has such a member of staff so they can undertake supervision of electrical work. The interesting question is if someone sent in an EIC to building control along with their qualifications and this was accepted, legally surely they would be responsible for that installation (would need Pli to cover the installation etc)

Councils charge on the basis of work they anticipate they will undertake during the build, most councils will state in their terms and conditions that all building inspection is priced on the assumption that any electrical work will be subject of design, installation and test certificate by an electrician who is a member of a competent person scheme. They will then go on to say that if it is not, they will make a supplementary charge which will reflect the costs incurred by them in instructing a third party competent person to undertake the necessary site visits and inspections which are required. This is to cover inspection of design, site visits to check work during inspection at first fix, inspection and text at completion. All councils set their own building control charges, as a customer you don't like them you are free to use any other independent third party inspectors. The golden rule for me when dealing with building control is to speak directly to understand what they require. Alternatively go on their website, there are very few which do not publicly outline their fee structure and requirements.
 
Someone did post a link to a web site that LBC are supposedly to use, to check the competency of electricians (checking their qualifications etc) to carry out domestic work. Recall another member saying he has approval from his BC to do domestic work without being in a scheme, catch was their wanted £80 or so each time.

OP, if it's just going to cost £360, and you doing the rewiring, still gonna save your uncle some cash (unless it's not a love job!).
 
So what you are saying is if you do not belong to one of the schemes you can pay LBC. fee prior to starting and they inspect in stages or you send Quals etc of to them pay smaller fee then what?do you test and they come at end of job who is the third party a contractor /in house. I assume that this is for a one off job only as they would expect you to be a member of a scheme after that.
 

Reply to Notify building control in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Evening all, Just a quick question, I am an electrical maintenance engineer and have 18th edition, inspection and testing and so on, so I get...
Replies
17
Views
1K
Hi all, I am a home owner and our builder has completed a garage conversion with the electrician installing a new 4 way distribution board. The...
Replies
18
Views
1K
I have a Firebird oil boiler that is controlled by a Honeywell timer (no thermostat) that has channels for hot water and central heating...
Replies
8
Views
430
Hello, I understand that from the 15th of June testing and commissioning of vents and fans is now compulsory and that also since last year any...
Replies
47
Views
4K
Hi all, If I aren’t part of one of 2 schemes is it possible to notify building control of your work? If I’m fully qualified and competent in...
Replies
8
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock