- Reaction score
- 362
There is another thread talking about the need for structural assessments but how do you pay for them?
Is the customer's deposit taken and a clause in the contract stipulates that if the structural survey fails (or re-enforcement is required but the customer doesn't want to do it) then the cost is deducted from the returnable deposit? Or do you take a hit?
Or?
Is the customer's deposit taken and a clause in the contract stipulates that if the structural survey fails (or re-enforcement is required but the customer doesn't want to do it) then the cost is deducted from the returnable deposit? Or do you take a hit?
Or?