Discuss PIR code... Intake ? in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

T

TPES

What do you make of this, would any of you give this a code, it's the intake coming in split between a row of properties, the conductor has been joined but is exposed and has tape on it, I'm thinking to just note it on the cert and not warrant a code?
 

Attachments

  • ImageUploadedByTapatalk1323338921.183137.jpg
    28.9 KB · Views: 45
i would protect yourself and give code 1 as an urgent defect, code 1 is because its exposed and someone could potentially touch it and get shock, i air on side of caution but also power suppliers take little responsibility but get client to contact them immediately while you are there
 
codes are only recommendations and not regulations and how different people look at safety aspect if unsure contact IEE theyll advise you proper method as different peoples interpretation , but because of possibility of touching live cables i would create an urgent defect report as dangerous and get client to sign it, then if someone is hurt there is no comeback to you
 
As you can see the insulation tape on the tail ends, what would the REC use to improve the connections on this external cut out?
 

Attachments

  • ImageUploadedByTapatalk1323524397.669462.jpg
    170.8 KB · Views: 18
Yeah, they are line taps, just looks a bit exposed to me, would you say this is perfectly safe then just above the front door and there's no improvement that the DNO can make?
 
if it looks exposed to you go with what you think as i said use urgent defect report and get client to sign it and show this to client, at end of day if someone gets injured or killed you could potentially be held liable by their insurance for not reporting fault, its about safety and i think you feel its unsafe cause unfortunately theres a few different opinions on what to do and by doing what im advising means you will not be held liable
 

Reply to PIR code... Intake ? in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Wouldn't normally note this as an observation on a report but feel I need to. The way the building has been wired is all circuits on L1 have been...
Replies
6
Views
978
I'm practising EICRs on friendly locations as I'm still in training - technically done my 2391-52 but frankly need loads more practise. I've just...
Replies
11
Views
796
Hello ! I am building for some time a cct to drive a 3digit multiplexed LCD. (from aliexpress) From the sellers on aliexpress I managed to find...
Replies
7
Views
1K
Apologies if this is in the wrong section - appreciate it's more of an educational question. That said I have 2391 - but the classroom environment...
Replies
2
Views
2K
5 single phases to one huge property. Backup generator which can take about 106 amps split between 2 phases - 1 phase will be wired through...
Replies
2
Views
520

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock