M
Martin1976
Good evening all !
I've been reviewing test sheets lately off sub contracting electricians not in a official capacity as of yet and there are a few items I have noted but would like peoples thoughts.
1. Cooker wired in 6.0 T+E Ref method 101 32a Rcbo surely a Code 2 but no mention in test sheet what would you recommend
2. Upgrading of gas and water bond in an old wylex consumer unit would this require an installation cert ? Plus on same job changing of a light to a different type in a special location would this be part p or classed as maintenance ?
Thanks all
I've been reviewing test sheets lately off sub contracting electricians not in a official capacity as of yet and there are a few items I have noted but would like peoples thoughts.
1. Cooker wired in 6.0 T+E Ref method 101 32a Rcbo surely a Code 2 but no mention in test sheet what would you recommend
2. Upgrading of gas and water bond in an old wylex consumer unit would this require an installation cert ? Plus on same job changing of a light to a different type in a special location would this be part p or classed as maintenance ?
Thanks all