Discuss scedule of inspections in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

B

blenki

Hi , regarding the shedule of inspections on an EIC a lot of houses do not have diagrams,instructions or circuit charts in them , do you guys put an X in the box and if so how do you rectify the situation
 
If its a PIR and it passes apart from that, then you could supply a circuit schedule.

You will need to findout what the circuits are doing anyway so it wont take long.

I have a template saved on my desktop specifically for this purpose, and for CU changes etc.

If you have just done a new circuit etc that doesnt warrant you touching any others then it can be justed noted as a 4 in the departures.
 
Hey mate.

As long as everything in the c.u - RCD's, MCB's etc are labelled for use in a domestic premesis then that's enough for me.

You can't really expect to see circuit charts and layout diagrams.

A little thing I do is photocopy the circuit details/test results page of the form and leave it by the board, folded up inside the visor.

Hope this helps.
 
Cheers jason , ive got part p assessment coming up and im doing a CU change , just making sure i get my paperwork sorted !

Ta lenny , i was thinking i was gonna have to go out and buy a laminator !
 
Last edited by a moderator:
No need for buying one of those, however, i put them in those clear pvc wallets.

If you are doing a CU change then yes, you should complete one.

No need to worry about diagrams etc, but make sure the CU has ALL the labels on it: RCD test, next inspection by, and 2 colour warning label.
 
And just to add if 100A cutout fuse make sure you have 25mm tails comming from meter output to CU.
Regards
Kung.
 

Reply to scedule of inspections in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Hi all, Been asked to do EICR on thatched property for insurance purposes, however they will want all C3 codes rectified. Haven't seen it yet but...
Replies
10
Views
1K
Hi Guys, looking at doing Initial and Periodic inspecting and testing. Looking between the CandG and EAL Just wondering if I can ask peoples...
Replies
16
Views
642
Hi I'm having some work done at my house and the electrician has said we need a full rewire. I'm a bit surprised given that we passed an...
Replies
33
Views
4K
Hi All Happy new year to all! First post but long timer lurker, so thanks for all the previous help! Just wanted to clarify something I have...
Replies
7
Views
819
For example the house today had two lighting T&E in the same MCB. I know it's fine, but as I test both 'radials' where and how do we enter them on...
Replies
6
Views
800

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock