Doesn't look too bad with what you had to work with, I prefer to leave a little more length on the cables, I prefer the tails from the bottom looped into main switch so it is impossible for them to be pulled out no matter how much downward force you put on them .

- - - Updated - - -

And yes I meant the black marks
 
Ooops ya will be on about my black markings on e live cores haha? Apart from that, what's your opinions on my board? :/

Neat enough. Maybe leave a bit more free length where possible (I know it sometimes isn't). How did you achieve the specified IP rating where you brought your tails in at the top? My preference is to avoid bringing cables in through the top surface or, if necessary, add a piece of trunking above to preclude finger access to the top surface of the CU enclosure.

I'll have to remember about the black stripes if I want to mark up cores for when my sheath markings are out of sight. Quite a neat idea. I notice that you changed your mind over the positioning of CBs 2 and 3.


Edit: Just noticed what lookes like a big rectangular hole in the bottom face. How did you cover this to stop finger access?

Edit 2: There don't appear to be enough CPC terminations for the number of final circuits?
 
Last edited:
A small fire alarm panel changeover we completed a couple of years back.
The room where the panel is located is not waterproof by any means. Usually when it rains outside, it rains inside too. (including above the panel)
Needless to say, the site will not weatherproof the building as they plan to pull it down in a few years, but they have to have a fire alarm system as it covers more than just this area.

Before:
DSC_0419.jpg

Panels designed and built in the office prior to taking to site:
DSC_0412.jpg

Last stages of install and commissioning: (prior to the arrival or replacement interface units and a glass windowed door for the right hand side box)

DSC_0439.jpg
 
Nice Mx setup, and good solution to the water problem, out of interest, are the din loop controllers switching plant, as there is a lot of them. Or are they being using as zone monitors into an existing old conventional system.
 
The box on the left has a mixture of Din rail I/O's and Zone Monitors.
The zone monitors are used to pick up all of the old non addressable zones.
The I/O's are used to signal a fire condition for each zone and general fault back to the security control room via an old network alarm module located nearby.

In the box on the right above the MX panel is an advanced sounder booster card with 2x 4 way sounder circuit controllers.
 
That's a really nice install Sythai, defiantly one to be proud of and use as advertisement.
Out of interest, what light switches and LED drives did you use?
 
That's a really nice install Sythai, defiantly one to be proud of and use as advertisement.
Out of interest, what light switches and LED drives did you use?

Many thanks.... majority of it was controlled by a Lutron Grafik Eye system, various different drivers all sourced/ spec'd by the customer


Wow sythai that looks great. Where did you get tiles from

Thank you..... It was from a company called Lite Tile (if you look on their website they also have a picture uploaded of the same job)

Illuminated kitchen splashbacks | LED Architectural Lighting | Glass Splashbacks | LiteTile
 
Looks very slick indeed - just out of curiosity, what do they do for socket outlets - are they on one of those stick thingies that pop up?

Good question is a bit sparse I know what you mean.... in the tumble unit at the end (far left of lite tile) there are 2 x doubles in there and 1 x double under the island
 

Reply to **Show Us Your Installs!!!** in the Australia area at ElectriciansForums.net

Similar Threads

Morning all, Really hoping to get some advice / confirm what a few of us are thinking about a job in the future. Back ground - We have to swap...
Replies
15
Views
396
Bit of a rant first to explain the situation:- Effing builders again, I knew there was a reason we hardly ever work for them. We've done a few...
Replies
12
Views
559
I'm unsure if I should be an electrician or maybe another trade is better. I have basically completed my first year of a foundation in...
Replies
9
Views
670
Hi all, My question relates to the omission of overcurrent protection (specifically overload and fault protection) at the origin of an...
Replies
6
Views
2K
Hello ! I am building for some time a cct to drive a 3digit multiplexed LCD. (from aliexpress) From the sellers on aliexpress I managed to find...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock