Afternoon All,
I've got a little project coming up soon and would like your thoughts to how i plan on running main sub feeds to some outbuildings etc. I have put together a little pic of the layout.
Here is what we have
Main House has a 3 Phase incomer with TN-S Earthing
Phase 1 = 2x 15 Way C.U's
Phase 2 = 1 6 Way C.U to house
Phase 3 = 2 redundant 60A switch fuses.
We have 5 out buildings to supply
WorkShop 80M away
A Large shed around 10M away from the Workshop
A Green house around 30-40m away from the workshop
A Garage 10m away from the main incomer
A pond & summer house around 30 - 40m away from the main garage.
Done some calcs and sized some of the main cables up already still some to do.
Thought i would put Garage on with small C.U and then the Workshop on its own (63A BS88) Switch Fuse
What's your thoughts so far?
Thanks for your time.
I've got a little project coming up soon and would like your thoughts to how i plan on running main sub feeds to some outbuildings etc. I have put together a little pic of the layout.
Here is what we have
Main House has a 3 Phase incomer with TN-S Earthing
Phase 1 = 2x 15 Way C.U's
Phase 2 = 1 6 Way C.U to house
Phase 3 = 2 redundant 60A switch fuses.
We have 5 out buildings to supply
WorkShop 80M away
A Large shed around 10M away from the Workshop
A Green house around 30-40m away from the workshop
A Garage 10m away from the main incomer
A pond & summer house around 30 - 40m away from the main garage.
Done some calcs and sized some of the main cables up already still some to do.
Thought i would put Garage on with small C.U and then the Workshop on its own (63A BS88) Switch Fuse
What's your thoughts so far?
Thanks for your time.