Evening, may I pick you brain guys?
I have wired a summer house about 30m away from the main board. I have used 32A at DB1 (not RCD protect) and 6mm² 3core SWA, where I have connected both black and sheath (sleeved) at both end as CPC. In the Summer house I have used shed consumer unit 1xRCD and 2 useable mcbs.
I test Ze and PFC at DB1. I then move to test the shed DB2 RCD, Ring final and light circuit.
I am wondering
1. if I use Zs at the DB2 as Ze while filling the cert or do I use Ze and PFC from DB1?
2. I have added a 32A mcb at DB1, do I test the whole DB1 or Ze and PFC from there are enough?
What are your thought guys?
Regards
I have wired a summer house about 30m away from the main board. I have used 32A at DB1 (not RCD protect) and 6mm² 3core SWA, where I have connected both black and sheath (sleeved) at both end as CPC. In the Summer house I have used shed consumer unit 1xRCD and 2 useable mcbs.
I test Ze and PFC at DB1. I then move to test the shed DB2 RCD, Ring final and light circuit.
I am wondering
1. if I use Zs at the DB2 as Ze while filling the cert or do I use Ze and PFC from DB1?
2. I have added a 32A mcb at DB1, do I test the whole DB1 or Ze and PFC from there are enough?
What are your thought guys?
Regards